BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Fitchburg, Massachusetts. Completed plans call for the renovation of a educational facility.

FSU will maintain the Bid holders list. Prevailing Wage Rates apply. Fitchburg State University reserves the right to waive any informalities or reject any bids if it is in the public interest to do so. The University Representative for this project is Heide Messing, Director of Capital Projects, 978-665-3681. The Alternate University Representative for this project is Brian Duffy, Director of Trades, 978- 665-3199 Question Deadline 04/20/2026 at 12:00 PM ET SCOPE The scope of the work, without limiting the generality thereof, shall consist of furnishing all labor, tools, equipment, materials, plants, and supervision to provide: Cooling Tower Cleaning (1 Cooling Tower with 2 cells), including drain, High Pressure cleaning, treatment with Biocide chemical, rinsing and fill; Chiller Cleaning (2 chillers), including punching the tubes and radiographic Eddy Current Testing; and any other work as described in the Drawings and Specifications. Work Areas: Antonucci Science Building, 333 North Street a. Cooling Tower on Penthouse Roof b. Chillers on Penthouse Roof c. Penthouse Mechanical Room 3. A Roof Plan Drawing is provided in Appendix A of these specifications for reference purposes only. All work is located on the fourth floor (Mechanical Penthouse and Roof). 4. Existing Cooling Tower has 2 cells. 5. Existing two (2) Chillers are: Carrier Water Cooled Chiller Model 23XRV

Post-Bid

Educational

$86,500.00

Public - State/Provincial

Renovation

3

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
991
Active Projects
585
Bidding Soon
5,712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

May 18, 2026

Project location map

333 North St, Fitchburg, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.