Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Brentwood, Missouri. Completed plans call for site work for a water / sewer project.
Repair and replace drainage system at Brentwood Bus Garage. Remove and replace 2 grated inlet tops and 1 double grated inlet top with new tops and grates Replace concrete around tops as needed Remove 1 existing manhole, partial concrete slab and dirt as needed. Replace manhole with new manhole base, poured in place base and sill section Replace any concrete to maintain slope to drain Replace dirt, seed and straw Remove approximately 2500 sq ft of existing PCCP concrete Removal includes saw cutting Dowel into existing concrete ADA ramp and entrance to facility Regrading and compacting of aggregate base Install approximately 2500 sq ft Portland Cement Concrete pavement 8” fiber mesh reinforced concrete and #4 epoxy coated rebar Reinstalled at like grades and breakpoint Must retain proper slope at storm drains for drainage Remove and install approximately 90 LF of pinned concrete curb and 160LF of new curb Must meet all Missouri DOT highway concrete spec. Replacement curb will match the line and grade of the existing curb Replacement curb shall be placed on PCC pavement free of dirt and debris #4 epoxy coated pins installed 24” on center to the curb to the pavement The length of the pins will be the thickness of the pavement and the height of the curb minus three inches. The top of the pin needs a minimum of 1 1/2inches of concrete cover To prevent erosion at the edge of drive extension rip rap will need to be installed for length of pour Clean up of area at the end of each work day and final clean up and removal of all debris and spoils at the conclusion of job. Questions deadline: 4/10/26
Post-Bid
Water / Sewer
$300,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2026
May 20, 2026
3000 S Brentwood Blvd, Brentwood, MO
Related To This Project
Brentwood, MO
--
Brentwood, MO
Bid Date: Jun 15 2026
Brentwood, MO
Bid Date: Jan 12 2026
Brentwood, MO
Bid Date: Dec 12 2025
Brentwood, MO
Bid Date: Nov 04 2025
Brentwood, MO
Bid Date: Oct 23 2025
Brentwood, MO
Bid Date: May 08 2025
Brentwood, MO
--
Brentwood, MO
Bid Date: Apr 12 2019
Brentwood, MO
--
Brentwood, MO
Bid Date: Jun 11 2024
Brentwood, MO
--
Brentwood, MO
Bid Date: May 20 2024
Brentwood, MO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
