Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 16, 2026
Demolition, site work and paving for a bridge / tunnel in Saint-Alexis-des-Monts, Quebec. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.
Reference number: 20137140 Deadline for receipt of complaints 2026-04-23 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 1 The Societe des etablissements de plein air du Quebec (hereinafter "Sepaq") is inviting tenders from contractors interested in carrying out demolition and reconstruction work on bridge H062-051 (the "Works"), located within the Mastigouche Wildlife Reserve (the "Establishment"). The Works consist of the demolition and reconstruction of bridge H062-051. The location of the bridge is shown on the map attached in Appendix C. The Works are detailed in the Plans and Specifications in Appendix B. The Works must be carried out between 1 June 2026 and 30 June 2026.
Post-Bid
Bridges / Tunnels
$400,000.00
Public - State/Provincial
Demolition, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 1, 2026
To Be Determined, Saint-Alexis-des-Monts, QC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
