BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Santa Rosa, California. Completed plans call for site work for a water / sewer project.

Replace approximately 650 feet of failing sewer pipe that was installed under Santa Rosa Creek west of the Fulton Road Bridge in 1969. The existing 18-inch diameter asbestos cement pipe (ACP) will be replaced with an 8-inch diameter gravity flow sewer using open trench construction methods under Santa Rosa Creek. The existing sewer now serves approximately 60 homes in the Countryside subdivision southwest of Fulton Road and Santa Rosa Creek, and has become partially obstructed, necessitating replacement. Online Q&A Yes Q&A Deadline 04/17/2026 10:00 AM (PDT)

Bid Results

Water / Sewer

$2,018,212.00

Public - City

Site Work

31

12

4

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
201
Bidding Soon
2,848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

May 28, 2026

Project location map

Fulton Rd, Santa Rosa, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.