BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work and new construction of a mixed-use development in Golden, Colorado. Completed plans call for the demolition of a library; for the construction of a 2,897-square-foot library; and for site work for a library.

Reference Number 0000420055 Source ID PU.AG.USA.2358.C5296376 Piggyback Contract No Estimated Project Cost:$550,000 Question Deadline 04/17/2026 at 5:00 PM MT Questions are submitted online No Colorado School of Mines (Mines) is seeking bids from General Contractors for a construction project at Arthur Lakes Library (LB) to install the School of Mines Testing Center on the lowest level of the building. Arthur Lakes Library houses the school's special collections, repository, classrooms, study rooms, offices, and a coffee shop. This project will demolish two classrooms and an office to install three testing rooms, two private testing rooms, and an office suite. Two other existing rooms will be repurposed to provide testing services. The total area of construction is 2,897 square feet. The new construction includes walls, doors, ceiling grid, flooring, and upgrades to the mechanical, data, electrical, and lighting systems. Scope of Services 1. The general contractor shall provide complete construction services for the demolition of the classrooms and office, including hauling and/or recycling refuse material, and the installation of the new testing center. 2. The project shall include all work needed for a complete, "ready to use" site. 3. Construction will be performed in cooperation with Colorado School of Mines. 4. The Scope of Work includes, but is not limited to, selective demolition, construction of Testing Center, site staging, site protection, temporary services, odor mitigation, and mechanical/electrical system integration. 5. The Project Manager has determined that the entire project shall be substantially complete within 9 weeks from the Construction Start Date to Substantial Completion. This project shall be finally complete within 10 weeks, including the delivery of any or all guarantees and warranties, the submittal of sales and use tax payment forms, the completion of the final punch list and the calling for final inspection. Location- Arthur Lakes Library 1400 Illinois St Golden, CO 80401

Bid Results

Library

$412,685.00

Public - State/Provincial

Demolition, New Construction, Site Work

26

23

8

5

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
115
Bidding Soon
1,249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

May 18, 2026

Project location map

1400 Illinois St, Golden, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.