Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a development in Whittier, California. Completed plans call for site work for a development.
The Work generally involves the construction of Phase 3B liner expansion at the Savage Canyon Landfill located in Whittier, California. The Work will consist of mass excavation; subgrade preparation; earthwork; installation of high density polyethylene (HDPE) geomembrane, geosynthetic clay liner (GCL), geocomposite, geotextiles; installation of HDPE, corrugated metal pipe (CMP) piping; construction of surface water control structures; and asphalt concrete paving for the access corridor. The Work generally involves the construction of Phase 3B liner expansion at the Savage Canyon Landfill located in Whittier, California. The Work will consist of mass excavation; subgrade preparation; earthwork; installation of high density polyethylene (HDPE) geomembrane, geosynthetic clay liner (GCL), geocomposite, geotextiles; installation of HDPE, corrugated metal pipe (CMP) piping; construction of surface water control structures; and asphalt concrete paving, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Caltrans Standard Specifications, 2024 Edition and the Standard Specifications for Public Works Construction (The Greenbook), 2024 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. The City of Whittier is accepting sealed bids for Project 23-019 Phase 3B Liner Expansion for the Savage Canyon Landfill. Plans and specifications may be requested from the City's plan holder, Plan-Well at www.planwell.com. Click on Public Planroom and find 23-019 Phase 3B Liner Expansion for the Savage Canyon Landfill. For specific information on the project, contact Public Works at PubWks@cityofwhittier.org.
Post-Bid
Conservation and Development
$5,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2026
July 6, 2026
Multiple Locations, Whittier, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
