BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a religious / funeral development in Elwood, Illinois. Working plans call for site work for a religious / funeral development.

The contractor shall provide all personnel, management, supplies, transportation, equipment, and supervision necessary to perform initial and replacement upright headstone and flat marker setting; raise and realign upright headstones; fine tune alignment of upright headstones; and cleaning of upright headstones in accordance with National Cemetery Administration technical specifications and National Shrine Standards. Initial and replacement upright headstones and flat markers shall be set within eight days of receipt. Approximately 4,250 +-5 percent existing upright headstones annually shall be raised, leveled, reset, realigned, backfilled, and cleaned, with headstones grouped in sections identified by the National Cemetery Administration within the first month of the period of performance and completed within the one-year performance period. Fine tune alignment work includes bringing approximately 8,500 +-5 percent existing upright headstones into alignment within one degree plumb and visually aligned horizontally, vertically, and diagonally. Cleaning services include annual cleaning of all upright headstones using approved products and methods. All services must comply with National Cemetery Administration standards and include all submittals, reviews, quality control, punch list corrections, cleanup, invoicing, and closeout documentation within 365 calendar days from issuance of the Notice to Proceed. Option years may be included. Location: Department of Veterans Affairs National Cemetery Administration, Abraham Lincoln National Cemetery, 20953 W Hoff Road, Elwood, IL 60421-9213 The magnitude of construction for this project is Between $5,000,000 and $10,000,000. per FAR 36.204 including options. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Religious / Funeral

$10,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
277
Bidding Soon
4,425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2026

Project location map

20953 W Hoff Rd, Elwood, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.