Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 14, 2026
Renovation of a mixed-use development in Orleans, Massachusetts. Completed plans call for the renovation of a educational facility.
Orleans Elementary School Fire Sprinkler Improvement Project :- Consisting of work required to achieve NFPA 25 compliance, including replacement of sprinkler heads, air compressor, pipe inspections, replacement of system gauges, and fire alarm interfaces, etc. A mandatory site visit is required to be considered. Location: Orleans Elementary School (OES), 46 Eldredge Park Way, Orleans, MA 02653 Work can start on July 1, 2026, and must be completed by August 14, 2026. Any questions must be submitted in writing to: procurement@town.orleans.ma.us. Estimated Cost: $80,000.00 General. The scope of work includes NFPA 25 fire sprinkler compliance replacement and investigative work. Base Scope of Work shall also include: a. Replacement of approximately 127 dry pendant sprinkler heads with nominal 12" spool piece attachments. The basis of design is a Reliance chrome head F3QR56, 12" "A" Dimension with an adjustable stainless steel escutcheon SIN R5714. Alternate manufacturers include Tyco, Victaulic and Viking. b. Replacement of the dry system's air compressor. The basis of design is a General Air L900A compressor, and an AMD-2 air maintenance device. Installation will include new piping, electrical connections, vibration isolation pads and secure mounting to the concrete slab. c. Internal pipe analysis of the dry pipe system. d. Internal pipe analysis of the wet pipe system. e. Replacement of Wet and dry system pressure gauges. f. Field inspection of existing systems is required as supplemental information, comprised of sprinkler plans and product data sheets are not available. g. Fire Alarm interface services to facilitate sprinkler work. h. Closeout documentation will include product data on newly installed equipment. i. The scope of work includes the proper off-site removal of all project-related rubbish. j. Photographs of existing components
Post-Bid
Educational
$80,000.00
Public - City
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2026
July 8, 2026
46 Eldredge Park Way, Orleans, MA
Related To This Project
Orleans, MA
Bid Date: Jun 05 2026
Orleans, MA
Bid Date: May 05 2026
Orleans, MA
Bid Date: Jan 30 2026
Orleans, MA
Bid Date: Jan 30 2026
Orleans, MA
Bid Date: Jan 30 2026
Orleans, MA
Bid Date: Jan 14 2026
Orleans, MA
--
Orleans, MA
Bid Date: Dec 05 2025
Orleans, MA
Bid Date: Nov 25 2025
Orleans, MA
Bid Date: Dec 01 2025
Orleans, MA
Bid Date: Nov 25 2025
Orleans, MA
Bid Date: Aug 27 2025
Orleans, MA
--
Orleans, MA
Bid Date: Jul 25 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
