Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Buhl, Idaho. Completed plans call for the demolition of a bridge / tunnel.

Remove the existing concrete bridge and replace it with a single-span prestressed voided slab concrete bridge on concrete abutments on 1550 East Road over Low Line Canal. The bridge to be replaced is approximately 2.7 miles south from the City of Buhl, Idaho. Sealed proposals will be received either electronically through QuestCDN or at the office of the Local Highway Technical Assistance Council. Question Deadline 04/13/2026 at 5:00 PM MT All questions and contact during the bidding period must be submitted through online portal.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - County

Demolition, New Construction, Paving, Site Work

47

7

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
6
Bidding Soon
178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 18, 2026

Project location map

1550 East Road, Buhl, ID


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed