BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 5, 2026 at 8:00 PM

Updated June 6, 2026

Site work and paving for a road / highway in Butternut, Wisconsin. Completed plans call for site work for a road / highway.

The project involves the HMA surfacing of 3,960 feet of Chippewa Lake Road (from Boness Road toward County Line Road) and 2,587 feet of Weinberger Road (from Boness Road to Witte Road). Work includes preparing the road for paving, shaping and compacting the existing gravel surface and base, adding a 2 1/2-inch lift of HMA to the finished base, and all necessary traffic control and incidental items to complete the work. The finished roadway will be 21 feet wide. Major quantities include 2,150 tons of Hot Mix Asphalt (HMA), preparation of the foundation for asphalt paving, traffic control, and incidental items. All procedures, work, and materials must conform to the Wisconsin Department of Transportation Standard Specifications, 2025 edition. Engineer certification as per Wisconsin DOT Local Road Improvement Program is required if the project is over $65,000, including a ten-year certification. The contractor will be responsible for compliance if a prevailing wage rate determination is ordered. A W-9 and Certification of Insurance from the successful bidder must be received prior to the commencement of the project. The Town of Chippewa reserves the right to accept or reject any or all bids or parts thereof, waive any information in the bidding process, and to accept the proposal or portion deemed most advantageous to the Town.

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
62
Bidding Soon
469
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 4, 2026

Project location map

To be determined, Butternut, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.