Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 18, 2026 at 8:00 PM

Updated July 8, 2026

Site work for a pipeline in Geneva, Illinois. Completed plans call for site work for a pipeline.

**As of June 18, 2026, the project was awarded to Utility Dynamics, with an awarded amount of $1,077,055.65.** This project consists of abandoning old cable and installing primary cable through conduit in Blackberry Subdivision and off of Miller Road in Geneva. The work includes the installation of new conduits (poly, PVC, and rigid), primary cable, splicing, and associated tasks to replace existing distribution circuits. Additionally, the scope involves installing new conduit, primary cable, splices, terminations, transformer vaults, and transformers for development projects in the City of Geneva. The work may also include boring new cable from cable faults and replacing switchgears, splices, and terminations resulting from unplanned outages. Bidders must submit duplicate sealed proposals in a clearly marked envelope. Each bid must be accompanied by a bid bond or a cashier's or certified check in the amount of ten percent of the base bid. The contractor and subcontractors are required to pay at least the prevailing wage rates and submit certifications regarding wage compliance and eligibility to bid. Plans, specifications, and construction drawings are available through the City of Geneva Public Works Department.

Award

Pipeline

$1,077,055.00

Public - City

Site Work

3

7

6

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
581
Active Projects
249
Bidding Soon
3,978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

July 20, 2026

Project location map

Blackberry Subdivision, Geneva, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed