BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a conference / convention center in Santa Ana, California. Completed plans call for site work for a conference / convention center.

The removal and replacement of colored concrete, non-colored concrete, and parking lot striping at the Civic Center is also included in the scope of work. Deployments of work will be on an on-call basis. Contractors may be notified to remove and replace a minimum of 100 square feet of concrete per on-call request. Lastly the scope of work includes removing and replacing faded signage around Civic Center. This may include but is not limited to ADA signage for parking stalls, regulatory signage, and galvanized steel 2-inch square posts. Liquidated Damages $1000 per calendar day Project Duration : 20 working days Question Deadline 04/16/2026 at 5:00 PM PT Online Q&A : Yes Bid(10.0%), Performance(100.0%), Payment(100.0%)

Bid Results

Conference / Convention Centers

$204,444.00

Public - City

Site Work

3

8

5

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
693
Active Projects
356
Bidding Soon
4,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 1, 2026

Project location map

Multiple Locations, Santa Ana, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.