BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a road / highway in Houston, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Asphalt Roadway Rehabilitation for Fuqua Street, Furman Road, and Fellows Road for Harris County Precinct 1 - UPIN# 22101mf2hr01. No additional scope of work or instructions to bidders were provided in the available text. Question Deadline 04/24/2026 at 12:00 PM CT The project roadways are classified as below. Fellows Rd. - Local Road with roadway length of approximately 1,600 ft. Furman Rd. - Minor Collector with roadway length of approximately 4,700 ft. Fuqua St. - Collector with roadway length of approximately 7,905 ft. The overall length of all the three roadways combined is approximately 14,205 ft. Project involves roadside improvements to existing asphalt roadway for three streets - Fuqua Street, Furman Road, and Fellows Road. The scope of the project is to investigate improvements to the existing open roadside ditches, drainage outfalls, and culvert replacements, as needed, to ensure capacity and positive drainage on a portion of the Fuqua Road. Also, improve intersection geometry for turning movements and develop proper methods to reinforce edges of existing pavement at intersections and culvert crossings and evaluate impacts on permitted driveway accesses. It will also include improvements to existing traffic signs and pavement markings. Improvements to the existing open roadside ditches, drainage outfalls, and culvert replacements, as needed, to ensure capacity and positive drainage on a portion of the Fuqua Road. Assess intersection geometry for turning movements and develop proper methods to reinforce edges of existing pavement at intersections and culvert crossings. The scope also includes development of Traffic Control Plans and preparation of preliminary study report of the roadways. The report contains assessment of roadways and recommends improvement methods, such as full depth reconstruction (FDR) and other relevant methods based on Geotechnical investigations. Based on the findings and field observations, full depth reconstruction of all three roads is suggested and some grading to roadside ditches to achieve positive flow. Drainage assessment for Furman Road and Fellows Road are out-of-scope for this project. Also, utility conflict assessments for Furman Road and Fellows Road are out-of-scope for this project. A drainage memorandum is prepared for the recommendations given as an appendix to this report. Also, discussed in the scoping meeting, the alignment of the roadway was to be maintained same including top of pavement elevations, grades, and roadside features. The project is more or less like maintenance or retrofitting work.

Post-Bid

Roads / Highways

$8,000,000.00

Public - County

Paving, Site Work

43

18

4

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

July 10, 2026

Project location map

Multiple Locations, Houston, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.