Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work, paving and outdoor lighting for a civil project in Southwest Ranches, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and for outdoor lighting for a road / highway.
Road Name: Tsm&o Tpk (Sr91) Griffin Road Interchange Improvements Limits: 86470000 Total Roadway Length: 0.510 Miles Contract Days: 331 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.510 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Description: Work consists of providing all labor, materials, equipment and incidentals necessary for milling and resurfacing, widening, guardrail, gravity walls, retaining walls, drainage modifications, signing and pavement markings, signalization, lighting, and ITS improvements at the interchange of SR 91 and Griffin Road (SR 818) from MM 53.853 to MM 54.208 in Broward County. No Pre-Bid Conference. Contractor must be prequalified. Question Deadline 05/06/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 004 - Grading & Drainage - SR 91 and Griffin Road
Post-Bid
Roads / Highways
$8,144,555.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2026
July 13, 2026
FL-818 & Griffin Rd, Southwest Ranches, FL
Related To This Project
Southwest Ranches, FL
Bid Date: Apr 03 2026
Southwest Ranches, FL
Bid Date: Jan 27 2026
Southwest Ranches, FL
Bid Date: Jan 28 2026
Southwest Ranches, FL
Bid Date: Jan 07 2026
Southwest Ranches, FL
Bid Date: Dec 09 2025
Southwest Ranches, FL
Bid Date: Oct 29 2025
Southwest Ranches, FL
Bid Date: Oct 08 2025
Southwest Ranches, FL
Bid Date: Aug 07 2025
Southwest Ranches, FL
Bid Date: Aug 06 2025
Southwest Ranches, FL
Bid Date: Jul 10 2025
Southwest Ranches, FL
Bid Date: May 08 2025
Southwest Ranches, FL
Bid Date: Apr 02 2025
Southwest Ranches, FL
Bid Date: Mar 26 2025
Southwest Ranches, FL
Bid Date: Mar 31 2025
Southwest Ranches, FL
Bid Date: Mar 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
