Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated May 19, 2026
Demolition and site work for a religious / funeral development in Roy, Utah. Completed plans call for the demolition of a religious / funeral development; and for site work for a religious / funeral development.
Reference Number 0000420146 Question Acceptance Deadline 04/24/2026 01:00 PM EDT Questions are submitted online Yes Each bid shall be accompanied by a certified check, cashiers check or bid bond in the amount of five percent (5%) of the total bid price payable to WEBER SCHOOL DISTRICT as a guarantee that the bidder, if his bid is accepted, will promptly execute the Contract, secure payment of worker's compensation insurance and furnish a satisfactory, faithful performance bond in the amount of one hundred (100%) of the contract price and a payment bond in the amount of one hundred (100%) of the contract price. cope of work: Demo of Former Church at: 5301 S 2100 W Roy UT 84067 General Notes: -Church is approximately approximately 18,450 SQ FT -Church has small Mechanical Room Basement -Lot size is approximately 2.73 acres -Demo and Remove building and foundation of church. -Remove all sidewalks except those called out in drawing to keep -Remove all Shrubs and Trees (including stumps) -Remove the flagpole and its foundation. -Remove all asphalt approximately 46,477 SQ FT -The entire area needs to be grubbed of all vegetation, turf ,and landscape and site demolition debris. -Rough Grade the entire site. -Fill with basement and foundation areas with compacted clean structural fill to 95% compaction -Contractor to provide clean compacted fill price -The contractor will have to obtain an Excavation / ROW permit from the city. Utilities: -WSD will have utilities shut off including water, sewer, power, telephone, and natural gas -Water: Contractor to cap behind the side walk -Secondary Water: Contractor to cap behind the side walk -Sewer: Contractor to cap Sewer behind side walk -Power: Weber School District responsible for removing transformer and site wire. -Telephone: Contractor to remove to pole -Natural Gas: Contractor to coordinate with gas company to remove gas meter and pipe to sidewalk -Storm Drain: Existing Sump to be discussed at job walk -Contractor to coordinate with the city on utilities capping Asbestos: -The asbestos report will be provided by Weber School District. -The asbestos report shows some less than 1% asbestos (in drywall plaster) , and this requires contractors to control dust and spray debris during demolition. -Contractor to control dust of demolition using a metered fire hydrant. This must be coordinated with Roy City. Safety: -Awarded contractor is responsible to secure site with construction fence (temporary 6' fencing ) -Contractor responsible for all safety during demo. Bid Information: -The Board of Education, Weber School District, reserves the right to accept or reject any or all quotes or any portion thereof and to waive any abnormalities during the bidding process as the District deems to be in their best interest. Low bid is no way binding The Board of Education, Weber School District, reserves the right to accept or reject any or all quotes or any portion thereof and to waive any abnormalities during the bidding process as the District deems to be in their best interest. Low bid is no way binding upon our district and final selection and honoring of the bids will be made by our office.
Award
Religious / Funeral
$209,414.00
Public - County
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
