BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Brookline, Massachusetts. Completed plans call for the renovation of a educational facility.

The Project consists of but not limited to: The project scope consists of roofing replacement and repairs to the Lawrence School & Baldwin School. The intent is to provide a sound roofing system that is leak free and weathertight. At project completion, Contractor shall provide a written guarantee that covers all defects in workmanship and materials for a period of two (2) years from date of acceptance, and a roofing system manufacturer’s twenty (20) year system warranty. General Bidders are to be DCAMM certified in Roofing (Prime). The Roofing Contractor shall be the General Contractor. The general scope of the construction work is as follows: Re-roofing of the existing flat roofing systems utilizing a “tear-off” application. A new adhered PVC roof membrane system (60-mil minimum thickness) is specified at Lawrence School & a new adhered EPDM roof system (60-mil minimum thickness) is specified at Baldwin Elementary and detailed complete with a manufacturer’s 20-year full system warranty. A new slate roof system (to match existing) is specified at the Baldwin Elementary complete with a manufacturer’s 100-year full system warranty. Associated Repair Work Items include but are not limited to: Lawrence School: (A) Replace roof drain bowls and install drain markers; (B) Install new scupper boxes with downspouts where indicated in the drawings; (C) Install ballasted safety railings at certain locations; (D) Temporary mechanical disconnects and reconnects; (E) Temporary electrical disconnects and reconnects; (F) Install roof drain deicing jig around all roof drains; (G) Install new skylights, frames & safety screens; (H) Install new pipe enclosure boxes; (I) Install walkway pads where indicated; (K) Replace sealant around windows & doors; (L) Remove & replace deteriorated steel decking; (M) Remove & replace deteriorated wood blocking; (N) Install snow melt cable system at existing slate roof. Baldwin School: (A) Repoint deteriorated mortar joints on chimneys; (B) Remove and replace cracked bricks on chimneys; (C) Temporary mechanical disconnects and reconnects; (D) Temporary electrical disconnects and reconnects; (E) Replace wood trim on cupolas where indicated in the drawings; (F) Remove & infill skylights & curbs; (G) Install new copper gutters and downspouts to match existing; (H) Remove & replace deteriorated wood trim; (I) Remove & replace deteriorated wood decking; (J) Install restoration coating on copper cupola roofs and sill pans; (K) Install snow melt cable system The work is estimated to cost $925,000.00. Question Deadline 04/24/2026 at 5:00 PM ET online QA submitted . Location 490 Heath St, Chestnut Hill, MA & 27 Francis St, Brookline, MA

Bid Results

Educational

$1,080,000.00

Public - City

Renovation

24

15

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
835
Active Projects
489
Bidding Soon
5,068
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

May 29, 2026

Project location map

Multiple Locations, Brookline, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.