Published June 1, 2026 at 8:00 PM
Updated June 10, 2026
Site work and paving for a road / highway in Atlanta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
SITE VISIT INFORMATION: A site visit will be held at 9:30 AM EDT on 15 May 2026. The site visit itinerary involves multiple project locations. Initial meetup will occur at the following location: 6323 Webster Rd, Cowen, WV 26206 To attend the site visit, contact the Contracting Officer, Matthew (Matt) Killian, via email at matthew.killian@usda.gov.Road repair services are anticipated on Forest Road 86 within the Monongahela National Forest. Work includes repairing base failures and pavement failures and resurfacing the roadway. Activities include milling or sawing pavement and excavating unsuitable material from failed areas as designated in the plans. Base failure repairs consist of placing rock and separation fabric to create French drains as needed, placing and compacting aggregate base stone, and placing hot mix asphalt base material to restore the roadway to original grade. After base repairs are completed, a combination of hot mix asphalt patching, leveling, and wearing courses will be placed throughout the entire project area. Road shoulders will be scarified, topsoil and vegetation removed, and aggregate placed and compacted to construct two shoulders. Milled hot mix asphalt material will be hauled to Forest Road 101 and placed in approximately three-inch-deep compacted lifts across the full road width in designated areas. All hot mix asphalt must be produced at a West Virginia Department of Highways certified asphalt plant, and contractors must account for time- and temperature-sensitive placement requirements. All work shall be performed by qualified personnel using safe, sound, and efficient construction practices in accordance with the draft Statement of Work and applicable specifications. The Method of Contractor Selection has not been determined at this Time. Scope of Work The Monongahela National Forest requests repair of base failures, pavement failures and resurfacing of Forest Road 86. Work includes milling or sawing of pavement and excavation of unsuitable material from failed areas as designated in the plans. Repairing base failure areas by placing rock and separation fabric to create French drains as needed, placing and compacting aggregate base stone, and placing HMA base material to bring the repair area back to original road grade. Once base failure repairs are complete, a combination of HMA leveling, and wearing courses will be placed throughout the entire project area. Shoulders will be scarified, topsoil and vegetation removed, and aggregate placed and compacted to create 1' shoulders. Milled HMA material will be hauled to FR 101 and placed in approximately 3-inch-deep compacted lifts, across the full road width in areas as designated by the COR. The Contractor shall provide all supervision, labor, equipment, materials, quality control, and incidentals for the completion of the project. The contractor shall perform all work in accordance with the contract drawings, detailed scope of work, industry standards, and the applicable sections of the WVDOH 2023 Standard Specifications for Construction of Roads and Bridges, Supplemental Project Specifications (SPS) Project Magnitude: Between $1,000,000 and $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. QUESTIONS may be submitted via email to the Contracting Officer, Matthew (Matt) Killian, at matthew.killian@usda.gov, until 1300 EDT on 05/21/2026.
Post-Bid
Roads / Highways
$5,000,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2026
June 15, 2026
Forest Road 86, Atlanta, GA
Related To This Project
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
Bid Date: Jun 01 2026
Atlanta, GA
--
Atlanta, GA
Bid Date: May 29 2026
Atlanta, GA
--
Atlanta, GA
Bid Date: May 13 2026
Atlanta, GA
Bid Date: Jul 16 2026
Atlanta, GA
Bid Date: Jun 03 2026
Atlanta, GA
Bid Date: May 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.