BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and new construction of a fire / police facility in Chandler, Arizona. Conceptual plans call for the demolition of a fire / police facility.

Fire Station 284 is located at the intersection of Kyrene Road and Chandler Boulevard. The facility was constructed in 1986 and has required multiple renovations and repairs to maintain functionality. On July 16, 2018, the City of Chandler commissioned a Facility Conditions Assessment (FCA) conducted by Faithful and Gould, Inc. A key finding is that the building was rated as being in "Good Condition", but requires significant building repairs. At the time, the assessors identified $1,152,285 of repairs needed over ten years, $35,416 of which was identified as needed in year one (2018). Additionally, the Fire Department commissioned a redesign and remodel study using DFDG Architecture. They noted direct openings from the living quarters and kitchen into the vehicle bay that allows vehicle exhaust and particulates to enter the station through those openings. Newer station designs include a transition area that maintains a positive pressure to prevent potentially harmful gasses from entering common areas. The new station is expected to add approximately 2,700 square feet in size. The Buildings and Facilities Division provided a building repair and maintenance cost of $4.80 per square foot. The utility cost of $1.45 per square foot for the station was derived from the 3-year average of the two newest fire stations. These operating and maintenance costs include a 3% annual inflation rate. Demolition of the current station is included in the construction costs, along with temporary housing for the firefighters. The Project is Included in the City's 2026-2035 Capital Improvement Program (CIP). . As of April 13, 2026 , further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fire / Police

$13,102,800.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2029

Project location map

N Kyrene Rd & W Chandler Blvd, Chandler, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.