Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 16, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of an educational facility in Hillsdale, Michigan. Completed plans call for the renovation of a educational facility.
Gier Elementary School in Hillsdale, Michigan, is seeking qualified contractors to submit proposals for the replacement of the existing cafeteria flooring. The project scope includes approximately 2,400 square feet of work, which involves the removal and disposal of the existing rubber floor and sleepers, surface preparation as required, and installation of a new flooring system. Contractors are requested to provide pricing for one or all three bid alternate options, including the installation of approximately 2,400 square feet of concrete at a depth of 3 to 3.5 inches. Proposals must include a detailed cost breakdown, timeline, specified materials, and references for similar completed projects. Project Scope: Total Area: Approximately 2,400 square feet Removal and disposal of existing rubber floor and sleepers Surface preparation as required Installation of new flooring system (see options below)
Post-Bid
Educational
$30,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 8, 2026
175 Spring St, Hillsdale, MI
Related To This Project
Hillsdale, MI
Bid Date: Apr 28 2026
Hillsdale, MI
Bid Date: May 28 2026
Hillsdale, MI
Bid Date: May 28 2026
Hillsdale, MI
Bid Date: May 28 2026
Hillsdale, MI
Bid Date: Jun 22 2026
Hillsdale, MI
Bid Date: Apr 28 2026
Hillsdale, MI
Bid Date: Apr 28 2026
Hillsdale, MI
Bid Date: Apr 28 2026
Hillsdale, MI
Bid Date: Apr 23 2026
Hillsdale, MI
Bid Date: May 01 2026
Hillsdale, MI
Bid Date: Mar 27 2026
Hillsdale, MI
Bid Date: Mar 09 2026
Hillsdale, MI
Bid Date: Apr 15 2026
Hillsdale, MI
Bid Date: Mar 03 2026
Hillsdale, MI
Bid Date: Mar 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
