Published April 18, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a power facility in Anchorage, Alaska. Completed plans call for site work for a power facility.

This Department of Energy, Denali Commission, and State of Alaska funded contract is for the complete renovation of an existing power plant including building renovation; installation of new owner furnished generators; renovation of existing switchgear; replacement and renovation of various mechanical and electrical systems; and other improvements in the community of Tuluksak, Alaska as described herein and shown in the Drawings. The Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, quality control, and supplies required to complete the work. The DOE Grid Resilience funds are exempt from BABA preference requirements pursuant to DOE's 8/18/23 DOE Tribal General Applicability waiver which waives all BABA preference requirements. All nonfederal match is also subject to the DOE Tribal General Applicability waiver. The Engineer's Estimate is between $1,500,000 and $2,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Note- Mailed Bids, amendments or withdrawals transmitted must be received at the above specified address no later than 4 hours prior to the scheduled time of bid opening. Hand-delivered bids, amendments or withdrawals must be received in the Bid Drop Box in front of the Alaska Energy Authority, prior to the scheduled time of bid opening. Emailed bid amendments or withdrawals must be received in the email inbox prior to the scheduled time of bid opening, addressed to: Selwin C. Ray, Email: AEAProcurement@akenergyauthority.org Question Deadline 05/01/2026 All questions relating to design features, constructability, quantities, or other technical aspects of the project should be directed to the following. Bidders requesting assistance in viewing the project must make arrangements at least 48 hours in advance with: Dawn M. Molina, Project Manager Phone: (907) 771-3904 Email: DMMolina@akenergyauthority.org All questions relating to bidding procedures should be directed to: Selwin Ray Contract Officer 813 West Northern Lights Blvd. Anchorage, AK 99503 Phone: (907) 771-3035 (907) 771-3055 Email: AEAProcurement@akenergyauthority.org Provide all work on the Tuluksak Power System Upgrade project except for work specifically indicated on the Drawings as Additive Alternates. Work shall include but not be limited to: A. Connect emergency generator (e-gen) with new riser as indicated to provide temporary prime power to community during major construction. Schedule power outage in advance with the local utility. B. Provide temporary three phase power to existing power plant for testing systems and equipment prior to commissioning. C. Demolish existing power plant features and systems and clean building as indicated. Provide building materials and modify building structure and add supports and other features as indicated. D. Provide mechanical equipment, piping, electrical equipment, wiring, raceways, lighting, instrumentation, controls, and all other materials as required to provide a complete, fully functional power plant. E. Install and connect new Owner Furnished engine-generators. F. Make minor modifications and provide new connections to existing enginegenerators. G. Furnish new components and modify existing switchgear. H. Provide new step up transformer bank. I. Furnish and install new Starlink system to provide internet service at power plant. J. Pressure test, flush, and charge all piping systems. Test all electrical and controls systems. K. Provide notice of Substantial Completion in accordance with Section 01 77 00 - Contract Closeout Procedures. Prior to Substantial Completion inspection the Contractor shall ensure that the Work is complete including but not limited to: 1. All systems are complete and ready for functional testing. 2. All required mechanical and electrical testing such as pressure, phase rotation, continuity, megger, etc. have been completed to the satisfaction of the Authority and the test results have been submitted in writing to the Authority. 3. All station service circuits are powered and have been tested. All motors have been checked for rotation. 4. All hydronic piping systems have been flushed with potable water and charged with glycol. 5. All instrumentation has been calibrated. 6. The intermediate fuel storage tank has adequate fuel. The day tank and used oil blender have been filled and tested. 7. The Fabricator of the Owner Furnished engine-generator #4 has performed the required initial startup, test run, and inspection of the engine-generator installation. 8. The Pre-Commissioning Substantial Completion Inspection Checklist has been filled out and submitted in writing to the Authority.

Post-Bid

Power Plant

$2,500,000.00

Public - State/Provincial

Site Work

53

18

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
13
Bidding Soon
112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

July 6, 2026

Project location map

To Be Determined, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.