BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Greensboro, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

REQUEST FOR PROPOSAL - PRL2026-21 THRU PRL2026-28 LRA2026-22 , LRA2026-23, LRA2026-24, RA2026-25, LRA2026-26 , LRA2026-27 The work consists of furnishing all equipment, labor, and materials for the complete construction of deep patching, mill tie-ins, and resurfacing of 6.09 miles of various county roads. The project includes striping, stop bars, and traffic control. Specific roads and work lengths are as follows: North Rhodes Street - 0.45 miles (deep patching, mill tie-ins, and resurfacing); Vandiver Road - 0.68 miles (deep patching, mill tie-ins, and resurfacing); Lewis Cemetery Road - 0.53 miles (deep patching, mill tie-ins, and resurfacing); Rock Hill Church Road - 1.80 miles (deep patching, mill tie-ins, and resurfacing); Chico Road - 0.55 miles (deep patching, mill tie-ins, and resurfacing); Walker Lane - 0.20 miles (deep patching, mill tie-ins, and resurfacing); Margaret Grove Road - 0.65 miles (deep patching and resurfacing); Lewis Road - 1.23 miles (deep patch only). The winning bidder must commence work with adequate force and equipment within ten calendar days from receipt of Notice to Proceed and complete the work by the specified date or as may be modified by special provision.

Post-Bid

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
103
Bidding Soon
1,318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

July 10, 2026

Project location map

Multiple Locations, Greensboro, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.