BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of an educational facility in Eugene, Oregon. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Provide new electronic readerboard at Charlemagne Elementary School, Adams Elementary School, Buena Vista Elementary School, and McCornack Elementary School. The work generally consists of installing an OFCI electronic visual display with associated contractor provided concrete footing/base, metal cabinet, signage/lettering, and the extension of the electrical and fiber optic cabling systems. Electrical/Fiber scope will be a design-build effort from the selected General Contractor. Contractor will be responsible for associated design, permits, and permit requirements related to the design-build electrical/fiber scope. Each Bid must be submitted on the prescribed form and accompanied by an electronic copy of a Surety Bond, Cashier's Check, or Certified Check, executed in favor of Eugene School District 4J, in the amount not less than ten percent (10%) of the total bid, based upon the total bid amount for those items bid upon. Bidders shall electronically submit, on the form provided, information regarding first-tier subcontractors furnishing labor or labor and materials, as provided in ORS 279.C.370. Bidders are required to hand deliver or mail by USPS, the original Surety Bonds, Cashier's Check or Certified Check and post marked within 3 days after the deadline for submission of bid. No bid for a construction contract will be received or considered unless the Bidder is registered with the Construction Contractors Board or licensed by the State Landscape Contractors Board at the time the Bid is made, as required by OAR 137-049-0230. For every bid $100,000 or greater, all Contractors and Subcontractors shall have a public works bond, in the amount of $30,000, filed with the Construction Contractors' Board (CCB), before starting work on the project, unless exempt. A copy of the Contractors' BOLI Public Works Bond shall be provided with the executed contract documents. Each Bid shall contain a statement indicating whether the Bidder is a "resident bidder", as defined in ORS 279A.120. Each Bid shall contain a statement that the "Contractor agrees to be bound by and will comply with the provisions of ORS 279C.800 through 279C.870 regarding payment of Prevailing Wages". Contractor shall certify nondiscrimination in obtaining required subcontractors, in accordance with ORS 279A.110(4). The District reserves the right to reject any or all Bids not in compliance with all public bidding procedures and requirements, postpone award of the Contract for a period not to exceed sixty (60) days from the date of bid opening, waive informalities in the Bids, select the Bid which appears to be in the best interest of the District, or reject any or all bids.

Bid Results

Educational

$133,587.00

Public - City

New Construction, Site Work

10

12

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
46
Bidding Soon
460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 20, 2026

Project location map

1968 Brittany St, Eugene, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.