BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in New York, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Milling and paving of an asphalt roadway is required. A mandatory site visit must be attended prior to submitting a quote. Quotes must include a detailed cost breakdown of materials, labor, and overhead, and a quote proposal form. This is a NYS Public Works Project, and prevailing wages must be paid. Vendors and sub-contractors must be registered with NYS Department of Labor, and a copy of the registration certificate must be submitted with the quote. CR#:2133959 Facility Address: 1150 Forest Hill Road - Building #24o, Staten Island, NY 10314 Any vendor questions not asked during the site visit must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov (within two business days of the site visit: April 24, 2026). Both questions and answers (if any) will be provided to all who attend the site visit via email by: April 29, 2026. Point of Contact: Maintenance: Stan Jakubowski (718) 983-5336 or (917) 636-2243 and/or Jose Lugo at (718) 983-5337 or (914) 565-9656 Business Office: Email- Brooklyn.CMM.Bids@opwdd.ny.gov All measurements shall be taken by the vendor chosen, for accuracy. Driveway front of 11N- Parking areas shall be included in Driveway front of 24-0 throughout entire site. Parking arbas shall be included in preparation and paving costs. Mill surface (cold planning) to proper depth and repave according to all NYC and NYS Standard Specifications. All edgings shall be incorporated to allow for proper drainage towards storm drains and no ponding of water. There is a channel drain at the end of drive. Channel drain base and grate shall be raised to appropriate height to prevent slips, trips, and falls and proer drainage. Rip out and remove existing asphalt Supply and install 5" (inches) of asphalt as per all specifications. Contractor to work from edge to edge. (Curb to curb). All sealed and bonded with proper sealants to prevent premature asphalt damage. Feather edging to existing asphalt for minimum height and prevent slip trip and fall hazards and prevent ponding. All building walkways, entry, paving shal be same height as handicapped curb. All parking line marking shall be reinstalled with proper Pavement Markings Regulations/ Standards.

Post-Bid

Roads / Highways

$50,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

June 10, 2026

Project location map

1150 Forest Hill Rd, New York, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.