Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated May 19, 2026
Site work for a civil project in Mistissini, Quebec. Completed plans call for site work for a water / sewer project.
Reference number: 20138801 Deadline for receipt of complaints 2026-05-07 Description The Cree Nation of Mistissini invites you to submit a bid for the implementation of a community infrastructure project. Here is a summary of the project: - Expansion of existing aerated lagoons and renovation of the technical building; - Expansion of aerated lagoons 3 and 4, including the installation of a waterproof geomembrane and the construction of a dike; - Installation of a new aeration system for the aerated ponds (aerators, aeration pipes, blowers, etc.) to improve oxygenation and biological performance; - Installation of a new diphosphatase system, including a chemical storage tank, a dosing system, piping, and a mixing chamber; - Construction of a sludge dewatering platform, including the installation of a waterproof geomembrane; - Pumping, transfer, and dewatering of sludge from the aerated ponds into geotubes; - Repair of non-functional valves, replacement, relocation, and addition of manholes and bypass pipes; - Installation of flow meters in the chambers; - Upgrading and modification of the building (mechanical, structural, architectural, and electrical); - Instrumentation and control; - Relocation of the existing ditch, including reprofiling and reconstruction of the perimeter drainage; Work is scheduled to begin on July 6, 2026. 7.3 Total Contract Duration The Contractor has a maximum period of two (2) years for construction, from July 2026 to November 2027, to complete all work covered by this contract, including all related work necessary for the proper functioning of the structures. The Contractor must perform this work without interruption and with due diligence to complete it within the time limits stipulated in the contract. 7.4 Mandatory phasing of the work (contractual milestones) The work must be carried out in accordance with the following phasing. Failure to meet the milestones constitutes a breach of contract. Phase 1 - Year 2026 Period: July 6 to November 27, 2026 Minimum work to be completed no later than the end of Phase 1: - Complete and functional construction of the wastewater dewatering platform. - Replacement of the aeration systems in aerated lagoons 1 and 2. - Minimum commissioning to ensure the safe operation of existing structures. Completion of Phase 1 is an essential condition for the continuation of work in Phase 2. Phase 2 - Year 2027 Period: Spring 2027 to November 27, 2027 Work to be completed no later than the end of Phase 2: - Expansion of Ponds 3 and 4. - Installation of aeration systems for Ponds 3 and 4. - Complete installation of the diphosphatase system. Those interested can obtain the tender documents on the electronic tendering SÉAO at https://seao.gouv.qc.ca or toll free at 1-866-669-7326.
GC Bidding
Water / Sewer
$20,000,000.00
Public - Federal
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2026
July 6, 2026
To Be Determined, Mistissini, QC
Related To This Project
Mistissini, QC
Bid Date: Sep 09 2025
Mistissini, QC
Bid Date: Sep 09 2025
Mistissini, QC
Bid Date: Jul 02 2025
Mistissini, QC
Bid Date: Jul 09 2025
Mistissini, QC
Bid Date: Jun 17 2025
Mistissini, QC
Bid Date: Jun 04 2025
Mistissini, QC
Bid Date: May 26 2025
Mistissini, QC
Bid Date: Mar 13 2025
Mistissini, QC
Bid Date: Oct 10 2024
Mistissini, QC
Bid Date: Sep 17 2024
Mistissini, QC
--
Mistissini, QC
Bid Date: Jun 19 2024
Mistissini, QC
Bid Date: Mar 21 2024
Mistissini, QC
Bid Date: Feb 26 2024
Mistissini, QC
Bid Date: Feb 26 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
