Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 18, 2026
Site work for a water / sewer project in Saint Helens, Oregon. Completed plans call for site work for a water / sewer project.
The Wastewater Capacity Improvements Project consists of the construction and replacement of sanitary sewer infrastructure within Basins 4 and 6 in the City of St. Helens. The project is intended to increase system capacity, improve reliability, and address existing conveyance deficiencies in key portions of the collection system. Work includes installation of approximately 12,449 linear feet of new sanitary sewer pipe of varying diameters, including 10-inch, 12-inch, 15-inch, 18-inch, 24-inch, 27-inch, and 28-inch pipe. Pipe materials include PVC and HDPE. Portions of the work will be constructed using trenchless methods, including installation of the 24-inch PVC pipeline and approximately 1,564 linear feet of 28-inch HDPE pipe. The project also includes a trenchless crossing beneath an active railroad. Additional improvements include rechanneling 18 existing manholes and installation of 49 new manholes. Associated utility and surface restoration work includes approximately 150 linear feet of water line relocation, 383 linear feet of storm drainage pipe replacement, trench backfill, asphalt paving, sewer system testing, and restoration of disturbed landscaping and surface features. A portion of the work occurs within the U.S. Route 30 right-of-way and will require coordination with and inspection by the Oregon Department of Transportation. This project is funded in part through the Clean Water State Revolving Fund (CWSRF). As such, the Contract Documents include federally required provisions. Contractors shall comply with all applicable CWSRF requirements, including but not limited to federal labor standards (including Davis-Bacon wage requirements), American Iron and Steel (AIS) provisions, and applicable environmental and reporting requirements. Bids received after this date and time will not be considered. First -tier Subcontracting Disclosure forms, per the instructions to bidders, are due within two (2 ) working hours after the bid submission deadline. Prequalification of Contractors and / or Subcontractors is not required. Final Completion: 740 Calendar Days Contract Documents , including plans and Specifications may be examined at Plan Center Northwest PO Box 2486 , Clackamas , OR 97015 503- 650-0148 *Bid Date Desc: No bid will be received or considered unless the bid is submitted in writing and received on the prescribed City Offer form , mailed or delivered to the City Administrator , City Hall , City of St. Helens , 265 Strand Street St. Helens , Oregon 97051 in a sealed envelope plainly marked on the outside of the envelope " SEALED BID and specifying the project name , Wastewater System Capacity Improvements Basins 4 and 6 , Project No. S -679 , and bearing the name and address of the bidder , the bidder's telephone number and the bid opening date . The City reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements , and may reject all bids for good cause upon a finding that it is in the public interest to do so . Evaluation of bids will be based on minimum requirements established by the specifications and compliance with conditions of the Notice to Contractors /Invitation to Bid and City's public contracting rules . Project costs are estimated between $22 million and $24 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Water / Sewer
$24,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2026
July 29, 2026
Multiple Locations, Saint Helens, OR
Related To This Project
Saint Helens, OR
Bid Date: May 13 2026
Saint Helens, OR
Bid Date: May 13 2026
Saint Helens, OR
Bid Date: Mar 17 2026
Saint Helens, OR
Bid Date: Jan 27 2026
Saint Helens, OR
Bid Date: Jan 13 2026
Saint Helens, OR
Bid Date: Dec 11 2025
Saint Helens, OR
Bid Date: Oct 24 2025
Saint Helens, OR
Bid Date: Aug 01 2025
Saint Helens, OR
Bid Date: Aug 12 2025
Saint Helens, OR
Bid Date: Aug 05 2025
Saint Helens, OR
Bid Date: May 29 2025
Saint Helens, OR
--
Saint Helens, OR
--
Saint Helens, OR
--
Saint Helens, OR
Bid Date: Mar 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
