Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a municipal facility in Brighton, Tennessee. Completed plans call for the renovation of a municipal facility.
The Project consists of the construction/alterations/demolition of building/utilities/sitework as described in the drawings and project manual. Work to be completed within 90 days consecutive calendar days. Questions shall be in writing addressed to Felipe Valestegui, AIA NCARB - Felipev@a2h.com and Heather Murchison, Project Coordinator - Heatherm@a2h.com . A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100. B. Hazardous Substances: Discovery of a suspected dangerous or hazardous substance during construction stops construction operations and may seriously delay a project. Contractors often encounter asbestos, lead, polychlorinated biphyenyls (PCBs), and similar hazardous materials on their construction projects. Because the use of those materials was common until recently, they are often found on renovation projects involving older buildings. AIA Document A201 outlines procedures contractors must follow when suspected dangerous or hazardous substances are uncovered during construction. If the suspect material proves to be a dangerous or hazardous substance, a contractor is not permitted to resume construction operations until the material has been rendered harmless or has been lawfully removed from the site. C. Scope of alterations work is indicated on drawings. D. Notice: In no event is a product to be used in this project known to contain any hazardous or toxic waste or material, radioactive materials, or other contaminants, the removal of which is required or the maintenance of which is prohibited, regulated or penalized by any local, state, or federal agency, authority or governmental unit. If any product is inadvertently specified which contains such materials, it is the contractor's, subcontractor's and supplier's obligation and duty to advise the Architect/Engineer of this fact prior to the ordering and/or installing of the product or material. E. Plumbing: Alter existing system and add new construction, keeping existing in operation. F. HVAC: Alter existing system and add new construction, keeping existing in operation. G. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation. H. Fire Suppression Sprinklers: Alter existing system and add new construction, keeping existing in operation.
Post-Bid
Municipal
$4,000,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
June 29, 2026
675 US-51, Brighton, TN
Related To This Project
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 04 2026
Brighton, TN
Bid Date: May 09 2025
Brighton, TN
Bid Date: Dec 06 2024
Brighton, TN
Bid Date: Oct 25 2024
Brighton, TN
Bid Date: Nov 10 2021
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
