BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in Brighton, Tennessee. Completed plans call for the renovation of a municipal facility.

The Project consists of the construction/alterations/demolition of building/utilities/sitework as described in the drawings and project manual. Work to be completed within 90 days consecutive calendar days. Questions shall be in writing addressed to Felipe Valestegui, AIA NCARB - Felipev@a2h.com and Heather Murchison, Project Coordinator - Heatherm@a2h.com . A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100. B. Hazardous Substances: Discovery of a suspected dangerous or hazardous substance during construction stops construction operations and may seriously delay a project. Contractors often encounter asbestos, lead, polychlorinated biphyenyls (PCBs), and similar hazardous materials on their construction projects. Because the use of those materials was common until recently, they are often found on renovation projects involving older buildings. AIA Document A201 outlines procedures contractors must follow when suspected dangerous or hazardous substances are uncovered during construction. If the suspect material proves to be a dangerous or hazardous substance, a contractor is not permitted to resume construction operations until the material has been rendered harmless or has been lawfully removed from the site. C. Scope of alterations work is indicated on drawings. D. Notice: In no event is a product to be used in this project known to contain any hazardous or toxic waste or material, radioactive materials, or other contaminants, the removal of which is required or the maintenance of which is prohibited, regulated or penalized by any local, state, or federal agency, authority or governmental unit. If any product is inadvertently specified which contains such materials, it is the contractor's, subcontractor's and supplier's obligation and duty to advise the Architect/Engineer of this fact prior to the ordering and/or installing of the product or material. E. Plumbing: Alter existing system and add new construction, keeping existing in operation. F. HVAC: Alter existing system and add new construction, keeping existing in operation. G. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation. H. Fire Suppression Sprinklers: Alter existing system and add new construction, keeping existing in operation.

Post-Bid

Municipal

$4,000,000.00

Public - County

Renovation

43

27

19

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
69
Bidding Soon
562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 29, 2026

Project location map

675 US-51, Brighton, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.