BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2026 at 8:00 PM

Updated September 3, 2026

Demolition, site work, paving and new construction of a civil project in Fort Morgan, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

The project will reconstruct I-76 between milepost 90.86-92.31 and replace four bridges(two at BNSF RR and two at the US6 interchange). The project will also convert US6 interchange to a tight diamond and add a new PnR off CO71 frontage road. Contract UDBE Goal: 0.00 % CODOT: 001 - Region 4 - I-76 Roadway Reconstruction and Bridge Replacements Lou spoke about how this project is approximately 1.5 miles long, 2 structures over the BNSF RR, 2 structures over US 6. US 6 will be reconfigured into a diamond interchange. The C&M agreement is close to being finalized. We have great relationships with Morgan County and the Town of Brush !. Day time work. Head to head configuration only during the April to November timeframe. Lane Rental Fee will start November 1 if still in the head to head configuration . Weekend and holiday traffic are generally in higher volumes for vacation travel to/from the Front Range. Some challenges include it being very windy at times, thunderstorms, weather in general. Contractor will need to help with snow removal if working when snow storms hit. We are all in this together and Lou's team's attitude is to solve problems on the project. December 15, 2028 need to be done by this date. PID- NHPP 0761-252 STA 0761-183 13568 IMO761-190 IM 0761-191 IM 0761-194 16426 R.O.W. Project Description STA 0761-174 12458 14838 15402 26370

Bid Results

$43,967,018.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
119
Bidding Soon
1,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

October 5, 2026

Project location map

Multiple Locations, Fort Morgan, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.