BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Chipley, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project involves the paving of Crystal Lake Road from the intersection of Tricia Trail to Amethyst Lane for a total length of 4000 linear feet. The scope includes drainage improvements using a combination of swales with ditch blocks, as well as signage and pavement marking during construction. Bids must be sealed and clearly indicate that they are for the CRYSTAL LAKE IMPROVEMENTS. Bid documents can be obtained from Dewberry. The completion period is 150 days from the Notice to Proceed, with liquidated damages set at $1,000 per day for failure to complete on time. Bids must conform to Section 287.133(3) Florida Statutes on public entity crimes. The County reserves the right to waive informalities, accept/reject any or all bids, and accept the bid deemed in the best interest of Washington County. Documentation or consideration of a vendor's social, political, or ideological interests is not permitted in determining vendor responsibility. For questions, please contact Jonathan Sims at (850) 354-5188 or jsims@dewberry.com

Sub-Bidding

Roads / Highways

$900,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

July 2, 2026

Project location map

Crystal Lake Road from Tricia Trail to Amethyst Lane, Chipley, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.