BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of an educational facility in Villa Park, California. Completed plans call for the renovation of a educational facility.

This project includes but is not limited to complete preparation and repaint of school exterior trim, fascia, windows, doors, sea containers, ball walls, ramps, and lunch shelter at three (3) Elementary Schools - Handy, Villa Park, and Linda Vista. Locations- Linda Vista Elementary School. 1200 N Cannon St, Orange, CA 92869. Villa Park Elementary School. 10551 Center Dr, Villa Park, CA 92861. Handy Elementary School. 860 N Handy St, Orange, CA 92867. Liquidated Damages $1,500 per calendar day Project Duration 45 Days Bid(10%), Performance(100%), Payment(100%) Question Deadline 05/08/2026 If any prospective bidder is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in, or omissions, a written request for an interpretation or correction thereof may be submitted to the District. Pre-bid clarification request shall be filed a minimum of six (6) days prior to bid opening. (a) Contractor responsible for: 1) Pressure wash all buildings to remove loose paint and dirt. 2) Mask, cover and protect surfaces not scheduled for painting with adequate protection. 3) Provide and spread drop cloths when and where required to provide the necessary protection. 4) Prep, sand, wipe down/clean make sure all surfaces scheduled for painting are ready for new paint coatings. 5) Paint all areas as indicated on Exhibit A: Exterior RePaint Specification a) Apply one (1) coat of District provided Vista Primer b) Apply a minimum of two (2) finish coats of District provided Vista Paint, or as required to achieve full, uniform coverage and complete concealment of the substrate. District will select color. 6) Remove all materials, supplies, debris, and rubbish and leave each area clean, and in acceptable condition. (4) Linda Vista Elementary School - Complete preparation and repaint of school exterior trim, fascia, windows, doors, sea containers, ball walls, ramps, lunch shelter, tables, and benches. (5) Linda Vista Elementary School, 1200 N Cannon St., Orange, CA 92867 (6) The Project Scope of Work includes the following: (a) Contractor responsible for: 1) Pressure wash all buildings to remove loose paint and dirt. 2) Mask, cover and protect surfaces not scheduled for painting with adequate protection. 3) Provide and spread drop cloths when and where required to provide the necessary protection. 4) Prep, sand, wipe down/clean make sure all surfaces scheduled for painting are ready for new paint coatings. 5) Paint all areas as indicated on Exhibit B: Exterior RePaint Specification a) Apply one (1) coat of District provided Vista Primer b) Apply a minimum of two (2) finish coats of District provided Vista Paint, or as required to achieve full, uniform coverage and complete concealment of the substrate. District will select color. 6) Remove all materials, supplies, debris, and rubbish and leave each area clean, and in acceptable condition.

Post-Bid

Educational

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
596
Active Projects
270
Bidding Soon
2,904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 15, 2026

Project location map

Multiple Locations, Villa Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.