Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a bridge / tunnel in Dixon, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The County of Solano, in conjunction with the County of Yolo, the California Department of Transportation, and the Federal Highway Administration, will rehabilitate Stevenson Bridge which spans over Putah Creek. The bridge was constructed in 1923. The construction contract has been awarded to A&B Construction. The Contractor will begin work on grading and scaffolding operations on May 1st, and bridge construction is projected to begin on June 15th. The selected consultant will provide construction management services for the Stevenson Bridge Road Bridge Rehabilitation Project. The Project is limited to repairs to an existing bridge (including bridge superstructure, and foundation), construction of a permanent maintenance access road, and construction of a temporary creek crossing. The Project purpose is to rehabilitate the existing bridge to address seismic deficiencies, scour, cracks, spalling, and delamination, while maintaining its historical architectural features. The Project will also realign approximately 1,000 feet of the southern roadway approach to eliminate two sharp turns; realignment will occur outside of the channel and riparian zone. The existing bridge is 296 feet long and 24 feet wide with two piers within the channel, and abutments on each bank of Putah Creek. To conduct bridge repairs as they relate to Project activities and future maintenance on the bridge, a permanent access road composed of gravel will be constructed on the northeast side of the bridge. To access the bridge for repairs a temporary creek crossing and a clear water diversion will be installed in Putah Creek to isolate construction activities that occur within the creek. The crossing and diversion will be designed consistent with the Caltrans Construction Site Best Management Practices (BMP) Manual (Caltrans 2017) in accordance with Non-Storm (NS) Water Management BMP NS-4 Temporary Stream Crossing and NS-5 Clear Water Diversion. The Project will remove 22 riparian trees and 6 elderberry shrubs (Sambucus mexicana) within the riparian zone. Bridge rehabilitation will involve the following elements: 1) repair and replacement of the bridge superstructure (deck, drains, railings, etc.), 2) repair of the bridge foundation, including installation of two cast-in-drilled-hole (CIDH) pilings per pier and abutment (ten pilings in total), 3) replacement of the abutment retaining wall on the south side of the bridge, and 4) installation of rock slope protection (RSP) around abutments and piers for scour protection. Repairs of the existing bridge foundations will occur outside of the water or in de-watered areas. The access road will result in 10,019 square feet (0.23 acres) of permanent impacts to stream habitat associated with construction of the road. The clear water diversion and creek crossing will result in a total of 5,823 square feet (0.134 acres) of temporary impacts to stream habitat associated with installation of headwalls, pipes, the de-watered area for access to the piers, and the creek crossing. Bridge repairs will result in 548 square feet of impacts per CIDH piling resulting in a total of 5,480 square feet (0.126 acres) of permanent impacts to stream habitat associated with CIDH piling installation. Placement of RSP will permanently impact 436 square feet (0.01 acres) of stream habitat. The Project's permanent impacts to stream habitat total 15,943 square feet (0.366 acres) and the temporary impacts to stream habitat total 5,823 square feet (0.134 acres). The Stevenson Bridge Road Bridge Rehabilitation Project is located approximately 8 miles north ofDixon, California. The project involves retrofitting the existing bridge, performing foundation upgrades, and improving the roadway approaches. The retrofit work includes carbon fiber wrapping ofthe arch, portal, vertical, and pier members; installation ofreinforced concrete girders and abutment bolsters; replacement of tie girder prestressing tendons; removal and patching of unsound concrete; epoxy injection of larger cracks; and removal ofthe existing concrete deck surface followed by placement of a polyester concrete overlay. Foundation work consists of installing new 2.2-meter cast-in-drilled-hole (CIDH) piles at each support, concrete footing encasement, and construction ofa permanent access road from the top ofthe north east bank to the bottom ofthe channel. Roadway approach work includes tree removal, grinding and removal ofthe existing asphalt concrete surface, grading, and construction of approximately 800 linear feet of new roadway.

Post-Bid

Bridges / Tunnels

$10,200,000.00

Public - County

Paving, Site Work

37

26

2

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

June 15, 2026

Project location map

Stevenson Bridge Rd, Dixon, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.