Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a playground / park / athletic field in Leland, North Carolina. Completed plans call for site work for a playground / park / athletic field.
The Town of Leland invites the submittal of qualifications from firms interested in providing professional design-build services to the Town of Leland, North Carolina for the design and construction of Sturgeon Creek Boardwalk and Dock. The design-build method is a qualifications-based selection process. As such, the ability of the Design-Builder to deliver the project on time, on budget, within the criteria and constraints identified by the Request for Qualifications (RFQ) document, and pursuant to the requirements of N.C.G.S. 143-128.1A.(c), are the primary factors for selection. All questions must be received by 1:00PM on May 6, 2026. Questions, requests for information, and responses to this RFQ shall be addressed and delivered to: Will Lear, Project Manager 102 Town Hall Drive Leland, NC 28451 wlear@townofleland.com (910) 408-9425 The Town of Leland reserves the right to reject any and all submissions for any reason or for no reason. The Town of Leland is soliciting qualifications for Design-Build Project delivery services for Sturgeon Creek Park Boardwalk and Dock Project. These improvements will provide a new, inclusive, outdoor recreational space for the residents of Leland and surrounding areas. Future Sturgeon Creek Park is located at 158 S Navassa Rd, Leland, North Carolina. Construction of the project is expected to begin in 2027. Preliminary needs include, but are not limited to, the following: o Elevated, ADA compliant, wooden boardwalk connecting to future boat ramp parking lot. o ADA compliant floating dock, accessible from elevated boardwalk. o All applicable electric, such as boardwalk lighting, outlets, etc. o Coordination of all applicable permits associated with Project Execute Contract/Notice to Proceed July 1, 2026 Project Completion December 2027 Boardwalk 1. The contractor shall provide engineered design, materials, electrical, lighting, permit administration, and labor to construct a complete ADA compliant, elevated 10 FT wide wooden boardwalk, ready for use, turnkey. All materials shall be new and free from defects and meet or exceed all industry standards. 2. The overall boardwalk length shall be a minimum of 400 FT, however may extend to cover additional area based on design and overall project budget. 3. Boardwalk will tie into concrete sidewalk connection that is to be constructed as part of an adjacent project. Floating Dock 1. The contractor shall provide design, materials, permit administration, and labor to furnish a complete, ADA compliant, floating dock, ready to use, turnkey. All materials shall be new, free of defects, and meet the specified needs. 2. The approximate size of the dock is expected to be 15 FT by 120 FT, however may be adjusted based on final design. 3. Dock should support temporary tie up of personal boats and watercraft as an ancillary amenity to the future Sturgeon Creek WRC Boat Dock, which is being constructed as a separate project. Project Budget The Town estimates an approximate total budget up to $1,500,000 for completion of this Project, including all costs and fees
Post-Bid
Playgrounds / Parks / Athletic Fields
$1,500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2026
July 1, 2026
158 S Navassa Rd, Leland, NC
Related To This Project
Leland, NC
Bid Date: May 27 2026
Leland, NC
Bid Date: May 15 2026
Leland, NC
Bid Date: May 19 2026
Leland, NC
Bid Date: May 08 2026
Leland, NC
Bid Date: May 07 2026
Leland, NC
Bid Date: May 07 2026
Leland, NC
Bid Date: Apr 30 2026
Leland, NC
Bid Date: Dec 17 2025
Leland, NC
Bid Date: Feb 20 2026
Leland, NC
--
Leland, NC
Bid Date: Apr 05 2021
Leland, NC
Bid Date: Jul 07 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
