BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a laboratory facility in Fort Pierce, Florida. Completed plans call for the renovation of a laboratory facility.

The work consists of providing all labor, equipment, and materials necessary to perform tornado damage repairs at facilities operated by the USDA Agricultural Research Service. The project involves renovation and repair of multiple greenhouse and support structures damaged by a recent tornado and will be performed in phases to allow continued use of the facilities and transition of ongoing research activities during construction. The total scope includes approximately 48,000 square feet of greenhouses and an additional 20,000 square feet of associated corridors, vents, and intake screening, with option pricing that may also be utilized. Phase 1 includes demolition and replacement of nine standard greenhouses, a corridor, vents, and intake screening totaling approximately 20,500 square feet, along with repairs to the roofing of the main building. Phase 2 includes demolition and replacement of eight standard greenhouses, four conditioned greenhouses, associated corridors, vents, and intake screening totaling approximately 24,000 square feet, and replacement of mechanical units on two adjacent storage buildings. Phase 3 includes demolition and replacement of four standard greenhouses and associated corridor, vents, and intake screening totaling approximately 11,000 square feet. Phase 4 includes demolition and replacement of six standard greenhouses with associated vents and intake screening totaling approximately 12,500 square feet. Additional work includes demolition and reconstruction of one greenhouse and one hoophouse at Picos Farm, construction of new prefabricated open-sided steel structures over existing slabs to protect pumps and mechanical systems, demolition and replacement or repair of greenhouses at Whitmore Farm, construction of a new prefabricated pesticide storage building, demolition of existing storage and pump house structures, and site restoration. All new greenhouse systems will include new microgrow control systems, compliance with Florida containment requirements, and properly meshed venting systems. The contract is anticipated to be awarded as a firm-fixed-price construction contract for a project with a construction magnitude exceeding $10,000,000. Questions shall be submitted via email to erin.riffey@usda.gov and are due no later than May 26, 2026, at 1:00 PM Eastern Time. 1232SA25F0461

GC Bidding

Laboratories

$10,000,000.00

Public - Federal

Renovation

110

19

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
63
Bidding Soon
913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2026

August 7, 2026

Project location map

Multiple Locations, Fort Pierce, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.