BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Leesville, Louisiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work to be bid: 1. 1.5" Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat and 1 and 1/2" hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12' - 22' wide road on prepared base and existing asphalt, priced per ton with suitable wearing coarse; 5% overrun; Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five days of notice from Vernon Parish Police Jury. 2. 2" Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat and 2" hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12' - 22' wide road on prepared base and existing asphalt, priced per ton with suitable wearing coarse; 5% overrun; Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five days of notice from Vernon Parish Police Jury. 3. Asphalt Grinding: labor and equipment to grind up asphalt / 3-shot roads, 2"-12" deep. Price per square yard. 4. Striping with Double Yellow Line with Reflectors: Labor and equipment to lay a solid yellow double line with amber reflectors every 25 feet in the middle of the roadway, lines will be 4 inches wide and 16 inches from outside to outside. Must meet LADOTD specifications. 5. Striping with Single Yellow Line with Reflectors: Labor and equipment to lay a solid yellow line with amber reflectors every 25 feet in the middle of the roadway, line will be 4 inches wide. Must meet LADOTD specifications. 6. Striping with Double Yellow Line: Labor and equipment to lay solid yellow double lines in the middle of roadway, 4 inches wide and 16 inches from outside to outside. Must meet LADOTD specifications. 7. Striping with Single Yellow Line: Labor and equipment to lay a solid yellow line in the middle of roadway 4 inches wide. Must meet LADOTD specifications. Bid envelopes MUST be sealed and marked on outside with company name, item being bid, date and time of bid opening, and contractor's license number. Failure to seal and mark bid envelopes correctly will result in the bid being rejected. The Vernon Parish Police Jury reserves the right to reject any or all bids for just cause in accordance with R.S. 38:2212 & 2214.

Post-Bid

Roads / Highways

$5,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
34
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

July 13, 2026

Project location map

Multiple Locations, Leesville, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.