BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 29, 2026

Site work and paving for a road / highway in Leesville, Louisiana. Completed plans call for paving for a road / highway; and for site work for a road / highway.

Asphalt overlay, road base preparation with Portland Cement soil stabilization and Lime Conditioning, road reclamation, and intersection/turnout widening. Work to be bid ( see project spreadsheet for details) : 2" Asphalt Overlay (Level 1 Non - Polymer) with base for Gravel or AsphaltRoads: labor, equipment, and materials to lay prime coat and 2" hot mixAsphalt overlay, 12' 22' wide and prepare the road base - - with 8-12 inches of Portland Cement stabilizing the soil and8-12 inches of Lime Conditioner whereneeded cut in on 12' 22' wide Graveland Asphalt and Road base . The top8-12 inches deep of all roads must bereclaimed before placing Soil Cementor Lime Conditioning, Soil Cementand Lime Depth and Percentages willbe determined by a qualified laboratory and bidder will be given that information and length and width of roadsbefore bidding 5% overrun ; January 1,2026 , to November 27, 2026 . Wideningof intersections and turnouts MUST bepriced as part of the road . Must meetLADOTD specifications. Contractorto respond and perform within five (5 ) days of notice from Vernon Parish Police Jury. OR - - 3" Asphalt Overlay ( Level 1 Non -Polymer) with base for Gravel or AsphaltRoads : labor, equipment, and materials to lay prime coat and 3" hot mixAsphalt overlay, 12' 22' wide and prepare the road base with 8-12 inches of Portland Cement stabilizing the soil and 8-12 inches of Lime Conditioner whereneeded cut in on 12' 22' wide Graveland Asphalt and Road base. The top8-12 inches deep of all roads must bereclaimed before placing Soil Cementor Lime Conditioning, Soil Cementand Lime Depth and Percentages willbe determined by a qualified laboratory and bidder will be given that information and length and width of roadsbefore bidding 5% overrun ; January 1 , 2026, to November 27, 2026 . Wideningof intersections and turnouts MUST bepriced as part of the road . Must meetLADOTD specifications . Contractorto respond and perform within five (5 ) days of notice from Vernon Pari

Post-Bid

$500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
35
Bidding Soon
568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2026

August 24, 2026

Project location map

300 S. 3rd St., Leesville, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.