BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2026 at 8:00 PM

Updated May 24, 2026

Site work and paving for a mixed-use development in Beverly Hills, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description: The Improvements under this Contract consist of construction of sidewalk, curb and gutter, drainage improvements, milling and resurfacing of existing pavement, construction of utility items, and associated temporary traffic control work on Forest Ridge Boulevard from West Lake Beverly Drive to West Colbert Court in Citrus County. Total Roadway Length: 0.750 Miles Contract Days: 254 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.750 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Question Deadline 05/13/2026 at 5:00 PM ET, Direct all questions to the Department by posting them to the Department's website. Questions posted to this site before 5:00 P.M. (EST) on the tenth calendar day prior to the bid opening, will be responded to by the Department. For questions posted after this deadline, an answer cannot be assured. FDOT - 012 - Roadway Signing / Pavement Markings - Forest Ridge Boulevard pn-44110515601

Post-Bid

Roads / Highways

$3,302,180.00

Public - State/Provincial

Paving, Site Work

236

12

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
160
Bidding Soon
2,531
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

July 20, 2026

Project location map

N Forest Ridge Blvd, Beverly Hills, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.