BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a mixed-use development in Woodland, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

General work description , as detailed on the construction plan : 2026 PAVEMENT PRESERVATION PROJECT , Base Bid (the roads within and surrounding the Town of Dunnigan , CR 88 , County Road 6, County Road 86 , County Road 18C , County Road 101, and County Road 102 from the Woodland City Limit to County Road 17. Work includes , but is not limited to : preserving survey monuments , traffic control , base repairs , pulverizing existing asphalt pavement , hot mix asphalt overlay , micro -surface , asphalt rubberized chip seal, installing curb ramps , shoulder backing , and striping . Alternate Bid # 1 ( County Road 28H from County Road 102 to 1.10 mi east ) : Optional work includes , but is not limited to traffic control , clearing and grubbing , milling and removing existing asphalt concrete surface , asphalt concrete paving , and striping . The optional work is for the County Road 28H segment , extending from County Road 102 (Sta. 0 +44 ) to 1.1 mile east ( Sta . 58 + 34 ) . The successful bidder shall furnish a payment bond and a performance bond , each in the full amount of the contract price . Each bid must be accompanied by a certified check , cashier's check , or bidder's bond made payable to Yolo County for an amount equal to at least ten percent ( 10% ) of the amount of bid , such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract . If a bond is used, it must be signed by the bidder and by two signatories of an authorized surety company all asprovided by law . Seventy - Eight (78) working days are allowed for completion of the work . Question Deadline 05/07/2026 at 5:00 PM PT Questions must be submitted in writing through electronically. Answers will be posted on electronically by 5:00 p.m. on May 11, 2026 . All bids will be compared using the Engineer's Estimate of the quantities of work on the Bid Item List . For the purposes of bonding , the engineer's estimate for the base bid work is in the range of $4.5 to $5.5 million . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$5,500,000.00

Public - County

Paving, Site Work

58

11

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
143
Bidding Soon
1,726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

July 13, 2026

Project location map

Multiple Locations, Woodland, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.