BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in Truckee, California. Completed plans call for the renovation of a municipal facility.

The Truckee Sanitary District is soliciting proposals from qualified engineering firms to provide professional design services for the replacement of the existing boiler system at the District's Field Operations Building (FOB). B. Scope of Work 1. Review of Existing Conditions o Review existing drawings, system documentation, and site conditions o Evaluate the current system and identify necessary upgrades o Review and validate the District's preliminary equipment list, including suitability for high-altitude operation Preliminary Equipment List Includes (subject to Consultant review): o Lochinvar FTX500N high-efficiency condensing boiler o Boiler booster pump o Taco SKV series pump o ASME expansion tank o Air separator o Coil hookup kits (17 units) o Automatic air vents (7 units) o Glycol feeder system o Belimo valves and actuators o Condensate neutralizer 2. Mechanical, Electrical, and Plumbing Design The Consultant shall prepare detailed design documents, including: o Mechanical system layout and piping design (including gas piping) o Electrical power distribution and control system design o Equipment selection and system sizing o Boiler room layout and code compliance evaluation o Energy modeling for proposed system alternatives Deliverables shall include: o Plans, specifications, and supporting calculations o Equipment schedules and control sequences 3. Energy Code Compliance o Prepare California Title 24, Part 6 compliance documentation for mechanical and electrical systems 4. Bidding Support Following completion of design: o Prepare construction drawings and technical specifications o Assist with bid package preparation o Support pre-bid meetings o Respond to bidder questions and prepare addenda o Attend bid opening o Provide recommendation for contract award 5. Construction Administration and Closeout The Consultant shall support the District through construction and project closeout, including: o Construction observation and coordination o Responding to RFIs and submittals o Assisting with issue resolution o Preparation of record (as-built) drawings o Warranty follow-up and project closeout support Question Deadline 04/27/2026 Contact for Questions Morgan Walters Mechanical and Electrical Maintenance Supervisor Phone: 530-913-0002 Email: mwalters@truckeesan.org *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated budget set aside for the project is $25,000-$35,000

Post-Bid

Municipal

$35,000.00

Public - City

Renovation

7

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
81
Bidding Soon
913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 5, 2026

Project location map

12304 Joerger Dr, Truckee, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.