BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Hutto, Texas. Completed plans call for site work for a road / highway.

The City of Hutto, a home rule municipality, is soliciting sealed bids from qualified contractors for furnishing all labor, materials, and equipment for the full depth rebuild of Live Oak Street located in Hutto, TX. The contractor is required to make a field visit prior to submitting bids to verify dimensions, site conditions, verify quantities, and provide traffic control plan necessary to perform work. The Traffic Control Plan shall be sealed by a Professional Engineer Registered in the State of Texas as required by the City Engineer prior to starting work. Base bid - for Live Oak Street, total length to be done is approximately 3,050 linear feet by 22 linear feet (LF), between Park Street going west shortly past West Street. The scope of work includes removing 7inches of asphalt, base, and subgrade,replacing with 5inches of Type B asphalt and 2inches of Type D asphalt, and associated traffic control, cleanup, and compliance with city specifications. Alternate bid A) for E. Metcalfe Street and W. Metcalfe Street, total length to be done is approximately 1,601 LF by 22 LF, between West Street going east towards FM 1660., and between FM 1660 going east to Church Street. The scope of work includes removing 7 inches of asphalt, base and subgrade, replacing with 5 inches of Type B hot mix asphalt and 2 inches of Type D hot mix asphalt, and associated traffic control,\ cleanup, and compliance with city specifications. Alternate bid B) for Hutto Street, total length to be done is 1720 LF by 22 LF, between Whitfield Street going east towards FM 1660. The scope of work includes removing 7 inches of asphalt, base and subgrade, replacing with 5 inches of Type B hot mix asphalt and 2 inches of Type D hot mix asphalt, and associated traffic control, cleanup, and compliance with city specifications. Alternate bid C) for Liberty Street and Church Street, total length to be done is 1870 LF by 22 LF, Liberty Street from Whitfield Street going east to East Street Church Street from FM 1660 going east to Pecan Street The scope of work includes removing 7 inches of asphalt, base and subgrade, replacing with 5 inches of Type B hot mix asphalt and 2 inches of Type D hot mix asphalt, and associated traffic control, cleanup, and compliance with city specifications. Construction is expected to be completed within 90 calendar days of Notice to Proceed. Deadline for Question Submittal 5:00 pm 5/13/2026 - Any questions, clarifications, concerns or requests for general information should be submitted in writing via Bonfire Intent to Bid Due Date: May 20th 2026, 10:00 AM CDT

Sub-Bidding

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
89
Bidding Soon
2,069
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.