Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a transportation facility in Hutto, Texas. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.
The intention is to select, via a One Step Method Request for Proposals, a Construction Manager-at-Risk for Hutto ISD's South Transportation Center. Proposers must prepare and submit a Proposal Submittal and Cost Submittal, including a response to all requirements indicated. Using the provided Cost Forms, offerors must submit their proposed pre-construction services fee, fee, and fee to fulfill the general conditions. Hutto ISD encourages online submission through Bonfire, but sealed physical proposals are also permitted, clearly marked and following specific requirements. Late, faxed, or emailed proposals will not be accepted. Required submittal contents must be organized in the order specified: Cover Letter, Questionnaire Response, Certification Form, Cost Form(s), and Attachment K (Deviations/Signature Page). Proposals are evaluated based on general firm information and reputation, general experience and reputation, proposed personnel, and price (fee and general conditions). Award is not necessarily made to the lowest proposer, but to the firm providing the best value per the evaluation criteria. Proposers must not contact any district personnel outside the procedures specified, and must acknowledge acceptance of the evaluation methodology and all proposal requirements. Question Deadline 05/06/2026 at 12:00 PM CT Online Portal Interviews (if necessary) Hutto ISD Operations and Construction Trailer; Located near Transportation Facility; 4035 N FM 1660, Hutto, TX 78634 May 18th 2026, 1:00 PM CDT - May 18th 2026, 5:00 PM CDT No The Hutto ISD South Transportation Center is a proposed facility located on a 23.75-acre tract west of Chris Kelly Blvd (FM 685) in Hutto, Texas. The project is designed to provide a small, specialized hub for district transportation operations while navigating significant environmental and legal constraints, including a 100' wide Oncor electrical transmission easement and FEMA floodplains. Building Scope & Square Footage The facility includes the following structures: o Transportation Building: A 64' x 64' pre-manufactured building totaling 4,096 square feet o Maintenance Building: A 40' x 60' three-sided, open-air metal building totaling 2,400 square feet o Bus Fueling Station: A dedicated on-site fueling area located adjacent to the maintenance facility. Parking Scope & Capacity The site design provides a total of 104 parking spaces distributed across two primary zones: o Bus Parking (40 Spaces): Located in the northern section of the site, these spaces are designed for full-size school buses. o Staff, Visitor, and Fleet Parking (64 Spaces): Located in the southern section, this lot is partitioned into specific use cases: o 20 White Fleet Spaces o 32 Bus Driver Spaces o 12 Visitor/Staff Spaces
GC Bidding
Transportation Terminals
$4,015,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
August 27, 2026
200 College St, Hutto, TX
Related To This Project
Hutto, TX
Bid Date: May 20 2026
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: Jun 03 2026
Hutto, TX
Bid Date: Jun 03 2026
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: May 11 2026
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: May 18 2026
Hutto, TX
--
Hutto, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
