BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a sidewalk / parking lot in Bloomington, Indiana. Completed plans call for site work for a sidewalk / parking lot.

This project shall include, but is not limited to, the Contractor shall be responsible for furnishing all labor, equipment, and tools required to perform the services requested in this quote. All work and materials shall conform to the most current Indiana Department of Transportation (INDOT) Standard Specifications for Asphalt Pavements. These specifications can be located on the INDOT website. PROJECT TO BE COMPLETED BY: JUNE 30, 2026 2026 Crack Seal Maintenance Project (10.27 Centerline Miles) N. Rogers St. from W Kirkwood Ave. to W. 11th St. E. 3rd St. from S Overhill Dr to S. Eagleson Ave. Rosewood Dr. from N Kinser Pk. to W Rosewood Dr. S. Sweetbriar Dr. from Wylie Farm Rd. to E. Sweetbriar Cir. E. Sweetbriar Cir. from S. Sweetbriar Dr. to Sweetbriar Ct. Sweetbriar Ct. from Sweetbriar Dr. to Dead End S. Henderson St. from E. Miller Dr. to E. Winslow Rd. S. Madison St. from W. Country Club Dr. to Dead End S. Bryan St. from Camden Dr. to Dead End W. Coolidge Dr. from S. Rogers St. to S. Bryan St. W. Gourley Pike from N. Old SR 37 to W. Arlington Rd. N. Monroe St. from W. Gourley Pike to W. 20th St. W. 20th St. from N. Monroe St. to W. Arlington Rd. E. Bill Mallory Blvd. from S. Graywell Dr. to State Rd. 446 S. Anthony Ct. from E. Bill Mallory Blvd. to Dead End E. Morningside Dr. from E. 3rd St. to N. Smith Rd. S. Parkridge Rd. from S. Graywell Dr. to State Rd. 46 (E. 3rd St) E. Grimes Ln. from S. Walnut St. to S. Henderson St. N. Lincoln St. from E. Kirkwood Ave. to E. 10th St. S. Swain Ave. from E. Atwater Ave. to Dead End E. Atwater Ave. from S. Highland Ave. to S. High St. Regents Cir. from E. Moores Pk. to Regents Ct. Regents Ct. from Regents Cir. to Dead End S. Wingfield Dr. from E. Moores Pike to Dead End Brechenmore Dr. from E. Wingfield Dr. to Dead End E. Saratoga Dr. from E. Morningside Dr. to S. Park Ridge Rd. S. Franklin Rd. from S. Fairfield Dr. to End of City Maintenance S. Fairfield Dr. from W. 3rd St. to S. Franklin Rd. S. College Mall Rd. from E. Moores Pk. to E. 3rd St. S. Pickwick Pl. from S. Winfield Rd. to E. Covenanter Dr. Question Deadline 04/27/2026 at 12:00 PM ET Inquiries must be submitted via the PROJECT LINK in OpenGov e-Procurement Portal and should be sent to: Julie Martindale, Purchasing Manager Email address: martindj@bloomington.in.gov

Bid Results

Sidewalks / Parking Lot

$69,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
57
Bidding Soon
940
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

June 23, 2026

Project location map

Multiple Locations, Bloomington, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.