BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 18, 2026

Site work and paving for a sidewalk / parking lot in Clinton, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The following generally describes the work included: o The construction of approximately 1,200 linear feet of a new 5-foot-wide sidewalk and associated earthwork/grading. o The construction of approximately 200 linear feet of concrete curb and gutter. o The construction of 2 concrete driveway aprons with drop curb and gutter. o Pavement replacement, installation and relocation of signs, new roadway paint striping, installation of truncated domes, and other associated work tasks necessary as the new 5-foot-wide sidewalk is constructed. o The installation, maintenance, and removal of erosion control facilities. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. Performance and Payment Bonds, each in the amount of 100% of the contract price will be required of the successful bidder. The Owner reserves the right to reject any or all bids or waive any informality in the bidding. The Owner anticipates award of the contract within thirty (30) days from the date of the opening of bids; however, to allow adequate time for approval, bids may be held by the Owner for a period not to exceed sixty (60) days from the date of the opening of bids. Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" from the Owner and to fully complete the project within 120 days. If the project remains uncompleted past the completion date, the Bidder may become liable for liquidated damages in the amount of $1,000.00 per calendar day for each day the project remains uncompleted. Question Deadline 05/01/2026 Each request for such interpretation should be in writing, addressed to Summit Engineering Group, Inc., 9601 Warren H. Abernathy Highway, Spartanburg, South Carolina 29301. To be given consideration, the request must be received at least five days prior to the date fixed for the opening of bids .

Bid Results

Sidewalks / Parking Lot

$131,625.00

Public - City

Paving, Site Work

18

8

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
112
Bidding Soon
1,352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

June 8, 2026

Project location map

SC-56, Clinton, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.