BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work for a water / sewer project in Myton, Utah. Completed plans call for site work for a water / sewer project.

Installation of 30 gate valves, size varying from 4" to 10", to isolate the existing culinary system, and surface restoration. It is anticipated that a majority of the initial work will take place outside of Myton Elementary School operating hours. Bidders are required to have UTERO Permit and maintain compliance for the duration of the project with UTERO. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Pre-qualification: Required. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference. Questions regarding the bid may be directed to Alan Allred 435-823-2796. All questions must be received in writing before May 15, 2026. Call Keri Brown 435-823-0172 or Linda Harrington 435-823-2711 if you cant get a hold of Alan. Responses to questions, Prebid Minutes, and Prebid attendance will be emailed as an addendum. Notice of Proceed – June 3, 2026 Substantial Completion – November 20, 2026 Final Completion – December 4, 2026 Engineer’s Opinion of Probable Cost is $250,000.00

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

9

18

6

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
13
Bidding Soon
173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

July 3, 2026

Project location map

To Be Determined, Myton, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.