Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 15, 2026
Demolition, site work and remodeling of a mixed-use development in Birmingham, Alabama. Completed plans call for the demolition of a water / sewer project; for the remodel of a transportation facility; and for site work for a transportation facility.
Installation and Removal of Motor Control Center for Storm Water Pump Station at the Birmingham-Shuttleworth International Airport.Deadline for Proposal Questions/Clarifications 4/17/2026 2.00 pm Birmingham Airport Authority is looking for safe removal, disposal, and replacement of the facility's existing MCC. The project includes disconnecting, removing, and disposing of the current MCC; supplying, installing, and commissioning a new MCC; and providing all associated electrical, mechanical, programming, and testing services. Currently we have a Cutler- Hammer 2100 MCC which is 1600-amps, 480-volt, 3-phase, 4-wir. We currently have four banks which each breaker feeding the pumps is 800 amp. The control system we currently have is a Watch Dog system. For this proposal we are looking for the following to be incorporated but not limited to.
Post-Bid
Water / Sewer
$350,000.00
Public - City
Demolition, Remodeling, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2026
June 26, 2026
5900 Messer Airport Hwy, Birmingham, AL
Related To This Project
Birmingham, AL
--
Birmingham, AL
Bid Date: May 12 2026
Birmingham, AL
--
Birmingham, AL
Bid Date: May 28 2026
Birmingham, AL
Bid Date: May 26 2026
Birmingham, AL
Bid Date: May 26 2026
Birmingham, AL
Bid Date: Jun 16 2026
Birmingham, AL
Bid Date: May 07 2026
Birmingham, AL
Bid Date: May 28 2026
Birmingham, AL
Bid Date: Jun 04 2026
Birmingham, AL
Bid Date: Jun 05 2026
Birmingham, AL
--
Birmingham, AL
Bid Date: May 21 2026
Birmingham, AL
Bid Date: May 20 2026
Birmingham, AL
Bid Date: May 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
