BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 15, 2026

Demolition, site work and remodeling of a mixed-use development in Birmingham, Alabama. Completed plans call for the demolition of a water / sewer project; for the remodel of a transportation facility; and for site work for a transportation facility.

Installation and Removal of Motor Control Center for Storm Water Pump Station at the Birmingham-Shuttleworth International Airport.Deadline for Proposal Questions/Clarifications 4/17/2026 2.00 pm Birmingham Airport Authority is looking for safe removal, disposal, and replacement of the facility's existing MCC. The project includes disconnecting, removing, and disposing of the current MCC; supplying, installing, and commissioning a new MCC; and providing all associated electrical, mechanical, programming, and testing services. Currently we have a Cutler- Hammer 2100 MCC which is 1600-amps, 480-volt, 3-phase, 4-wir. We currently have four banks which each breaker feeding the pumps is 800 amp. The control system we currently have is a Watch Dog system. For this proposal we are looking for the following to be incorporated but not limited to.

Post-Bid

Water / Sewer

$350,000.00

Public - City

Demolition, Remodeling, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
39
Bidding Soon
658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

June 26, 2026

Project location map

5900 Messer Airport Hwy, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.