Published May 12, 2026 at 8:00 PM

Updated May 14, 2026

Demolition, site work, paving and new construction of a civil project in Otsego, Minnesota. Completed plans call for the construction of a 6,000-square-foot water / sewer project; for the demolition of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The Contractor shall furnish all labor, materials, tools, and equipment and perform all Work necessary to construct a complete and operational 3,000 gallon per minute iron, manganese, and radium removal water treatment plant, as specified and indicated in the Contract Documents, including the following major components: Construction of a new 6,000-square-foot removal facility housing two steel pressure filters, chemical storage rooms, a spare chemical room, a mechanical room, and an electrical room; installation of two double-cell, dual-media pressure filters with associated piping, air wash blower, process piping and valves, and chemical feed systems including sodium hypochlorite, fluoride, phosphate, and HMO, along with a backwash reclamation system; construction of two 108,000-gallon backwash reclamation tanks with reclaim pumps, sludge-to-sanitary pumps, and associated process piping, fittings, valves, and spray wash systems; installation of HVAC systems, ductwork, water-source heating, water heaters, dehumidification, domestic plumbing, sanitary systems, and related mechanical appurtenances; complete electrical construction for the treatment plant and adjacent well, including power distribution, variable frequency drives, high and low voltage systems, standby generator and switchboard, lighting, control wiring, control panels, and cellular telemetry; all work outside the building footprint, including site utilities, grading, driveways and paving, stormwater pond construction, and associated site improvements; demolition of existing chemical feed rooms and equipment, and modification of process piping and valves at Wellhouse No. 3 to convey combined raw water to a connection point at the site boundary; additional improvements as indicated in the Contract Documents. Certain major process equipment, including the pressure filters, blower, and associated components, will be furnished by the Owner; the Contractor shall be responsible for coordination, receipt, unloading, storage, protection, installation, and integration of all Owner-furnished equipment into the Work, following Manufacturer's requirements and preserving applicable warranties. Bidders shall meet the minimum qualifications as specified in Specification Section 00 45 13 - Bidder Qualification Form. Bids shall include a Bidder's Bond equal to five percent of the full amount of the Bid, be licensed for the full amount, and must certify as a Responsible Contractor by signing a certification form in Section 00 43 29 of the project documents. No Bid will be considered unless it fully complies with the Bond, license, and certification requirements. Bidders are required to comply with all applicable funding agency requirements as outlined in Section 00 73 40 - Funding Agency Requirements, including Build America, Buy America, American Iron and Steel, prevailing wage rules, Disadvantaged Business Enterprise participation, civil rights, and other applicable federal or state laws and regulations. Bidders shall submit a qualification package at least fourteen calendar days prior to the date of receipt of Bids for each proposed 'Prior Approved Equivalent' manufacturer or supplier not already listed as acceptable in the specifications, in accordance with Section 00 26 00 - Procurement Substitution Procedures. The Owner reserves the right to reject any or all Bids, waive any irregularities or informalities, and award the Contract in the best interest of the Owner. The Owner reserves the right to hold the three lowest Bids for a period not to exceed sixty days after the date of Bid opening. No Bidder may withdraw their bid for a period of sixty days after the bid opening. Question Deadline 05/08/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. I A mandatory Pre-Bid Conference will be held online for all prospective Bidders at which time the Owner's Representative,prospective Bidders, and Subcontractors will review and discuss the Project. A link to access the conference will be provided to all plan holders prior to the meeting. Attendance is required for all prospective Bidders submitting a Bid, and the Owner reserves the right to reject the Bid of any prospective Bidder that does not attend. To access the conference, please use the link or call-in number/Conference ID provided below. All attendees are requested to have a working microphone so that attendance can be properly recorded

GC Bidding

Water / Sewer

$10,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

374

86

41

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

July 20, 2026

Project location map

7540 Kalland Ave NE, Otsego, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.