Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 14, 2026
Renovation of an educational facility in Rock Hill, South Carolina. Completed plans call for the renovation of a educational facility.
Reference Number 0000421346 Sullivan MS HVAC Systems Replacement - The District is seeking competitively sealed bids for HVAC Systems replacement at Sullivan Middle School. This project will include Kitchen Unit Ventilator & Condenser Replacement as well as a Gymnasium RTU Replacement. Location- 1825 Eden Terrace Rock Hill, SC 29730 The Contractor shall provide all labor, materials, equipment, and supervision required for the turnkey, like-forlike replacement of two (2) existing Trane Split System Unit Ventilators and two (2) corresponding outdoor condensing units. MECHANICAL SCOPE o Demolition: Recover all refrigerants from both indoor and outdoor units per EPA regulations and return to Rock Hill School District HVAC Department. Remove existing unit ventilators and outdoor condensing units from the premises. o Installation: Supply and install two (2) new unit ventilators and two (2) matching outdoor condensing units. o Linesets: Flush, clean, and pressure test existing refrigerant linesets with dry nitrogen to ensure compatibility with new equipment and R-410A (or current standard) refrigerant. o Components: Install new thermal expansion valves (TXV) and liquid line filter driers for each system. o Condensate: Reconnect and verify proper drainage for indoor unit condensate. ELECTRICAL AND CONTROLS o Power: Reconnect existing 480VAC, 3-Phase power to the new indoor electric heat sections and outdoor condensers. o Factory Controls: Units must be supplied with Factory Furnished and Factory Installed (FF/FI) DDC controllers. o Niagara 4 Integration: Controls must be fully compatible with the school's existing Niagara 4 legacy system for centralized scheduling and monitoring. The Contractor shall provide all labor, materials, equipment, and supervision required for the turnkey, like-forlike replacement of three (3) existing Aaon Rooftop Units (RTUs) serving the Gymnasium at Sullivan Middle School. MECHANICAL SCOPE o Recover refrigerant from existing units in accordance with EPA regulations and turn over to Rock Hill Schools HVAC department. o Disconnection and removal of existing RTUs from the roof. o Supply and installation of three (3) new Aaon units with equivalent performance specifications. o Provision of crane and rigging services for unit removal and installation. o Verification of curb compatibility; supply and install curb adapters if required. o Reconnection of natural gas piping, including new sediment traps and shut-off valves. o Installation of new UV-resistant condensate traps and drainage. Question Deadline 05/07/2026 at 12:00 PM ET Questions pertaining to the terms and specifications shall be directed to Wfaris@rhmail.org . Source ID PU.AC.USA.2914204.C20726251 Piggyback Contract No General Requirements - Insurance Required - License Required - Warranty Information Required
Post-Bid
Educational
$200,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
