BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a sidewalk / parking lot in Guntersville, Alabama. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

grade, drain, base, paving, markings, and fencing for terminal parking lot Total Contract Time for completion of the work is ninety (90) calendar days. Liquidated damages for delay will be in the amount of $1,000.00 per calendar day that the project remains incomplete after the specified completion time. Bid Security: Each BIDDER must deposit with his BID, as Bid Security, a Bid Bond payable to the OWNER in an amount equal to five (5) percent of the total amount Bid, but in no case more than $10,000.00. Contract Security: The Successful BIDDER will be required to furnish separate performance and payment bonds payable to the OWNER. Each bond shall be in an amount equal to 100% of the Contract Price as security for CONTRACTOR'S faithful performance and payment of all obligations under the Contract Documents Bids are to be based upon prevailing wages in Marshall County, Alabama; and in no case are wages considered less than those predetermined by the Secretary of Labor, a schedule of which is contained in the Contract Documents. The Owner reserves the right to refuse to issue a proposal form to a prospective bidder should such bidder be in default for any of the following reasons: (a) Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding. (b) Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force (with the owner) at the time the owner issues the proposal to a prospective bidder. (c) Contractor default under previous contracts with the Owner. (d) Unsatisfactory work on previous contracts with the Owner. Question Deadline 04/24/2026 All questions about the meaning or intent of the Contract Documents shall be submitted to ENGINEER Jeff Redmill in writing.

Post-Bid

Sidewalks / Parking Lot

$700,000.00

Public - City

Paving, Site Work

16

6

8

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
47
Bidding Soon
775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

June 5, 2026

Project location map

405 Buck Island Rd, Guntersville, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.