Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 15, 2026
Site work and new construction of a military facility in Whiteman Air Force Base, Missouri. Completed plans call for the construction of a military facility; and for site work for a military facility.
Construction of a B-21 Weapons Release System Storage (WRSS) facility is required at Whiteman Air Force Base in support of mission needs. The project will be executed as a design-bid-build effort under a single firm-fixed-price contract and includes all work necessary to deliver a complete and functional WRSS facility in accordance with the contract drawings and spec. The project is totally set aside for small businesses under NAICS 236220, Commercial and Institutional Building Construction, with an estimated magnitude between $10,000,000 and $15,000,000. Offerors are required for power outage interruptions, and submission of site visit information is required by May 04, 2026. Location: Whiteman Air Force Base, 509 Spirit Blvd, Whiteman AFB, MO 65305 For scheduling proposal purposes the contract award is August 11, 2026 with NTP approximately 1 month later. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Military
$15,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2026
August 24, 2026
509 Spirit Blvd, Whiteman Air Force Base, MO
Related To This Project
Whiteman Air Force Base, MO
--
Whiteman Air Force Base, MO
Bid Date: May 07 2026
Whiteman Air Force Base, MO
Bid Date: May 15 2026
Whiteman Air Force Base, MO
Bid Date: May 05 2026
Whiteman Air Force Base, MO
--
Whiteman Air Force Base, MO
Bid Date: Feb 25 2026
Whiteman Air Force Base, MO
Bid Date: Sep 18 2025
Whiteman Air Force Base, MO
--
Whiteman Air Force Base, MO
Bid Date: Sep 15 2025
Whiteman Air Force Base, MO
Bid Date: Sep 12 2025
Whiteman Air Force Base, MO
Bid Date: Aug 19 2025
Whiteman Air Force Base, MO
Bid Date: Aug 11 2025
Whiteman Air Force Base, MO
Bid Date: May 07 2025
Whiteman Air Force Base, MO
Bid Date: Jun 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
