Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work and new construction of a civil project in Key Biscayne, Florida. Completed plans call for the construction of a water / sewer project.

This project consists of the construction of a new Pump Station for Municipal Injection Wells at the Central District Wastewater Treatment Plant (CDWWTP). This project is one in a series of projects that are being processed under County Code Section 2-8.2.12, entitled Miami-Dade Water and Sewer Department Consent Decree and Capital Improvement Programs Acceleration Ordinance. Estimated Range of the Base Bid - $168,730,400.06 to $204,154,461.95, not including contingency and dedicated allowances. Project Duration: 1,131 Calendar Days to Substantial Completion, 1,191 Calendar Days to Final Completion, plus a 119 Calendar Day Contingency Period. Question Deadline 05/22/2026 at 5:00 PM ET Online submission. The WORK consists of the construction of the Municipal Injection Well Pump Station; construction of Plant Effluent Loop piping; construction of wellhead pads and installation of wellhead piping and equipment for nine (9) Class I municipal deep injection wells (drilled by others); piping to connect the Plant Effluent Loop to the nine new deep injection wells; construction of wellhead pads and installation of wellhead piping and equipment for four (4) monitoring wells; construction of thirteen (13) well houses to house the well instruments and RTU of each well; preparation and final grading and drainage of six (6) sludge drying beds; and associated yard piping at the Central District Wastewater Treatment Plant (CDWWTP). The CDWWTP is owned by the Miami Dade Water and Sewer Department (WASD) and it is located at 3989 Rickenbaker Causeway, Key Biscayne, FL 33149. The design and drilling of the nine Class I municipal deep injection wells is part of a separate contract and is not included in this scope of work. The design and drilling of the four monitoring wells is part of a separate contract and is not included in this scope of work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$204,154,462.00

Public - County

New Construction, Site Work

489

47

31

6

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
92
Bidding Soon
1,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

August 8, 2026

Project location map

3989 Rickenbacker Cswy, Key Biscayne, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.