Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2026 at 8:00 PM
Updated June 10, 2026
Site work and new construction of a civil project in Key Biscayne, Florida. Completed plans call for the construction of a water / sewer project.
This project consists of the construction of a new Pump Station for Municipal Injection Wells at the Central District Wastewater Treatment Plant (CDWWTP). This project is one in a series of projects that are being processed under County Code Section 2-8.2.12, entitled Miami-Dade Water and Sewer Department Consent Decree and Capital Improvement Programs Acceleration Ordinance. Estimated Range of the Base Bid - $168,730,400.06 to $204,154,461.95, not including contingency and dedicated allowances. Project Duration: 1,131 Calendar Days to Substantial Completion, 1,191 Calendar Days to Final Completion, plus a 119 Calendar Day Contingency Period. Question Deadline 05/22/2026 at 5:00 PM ET Online submission. The WORK consists of the construction of the Municipal Injection Well Pump Station; construction of Plant Effluent Loop piping; construction of wellhead pads and installation of wellhead piping and equipment for nine (9) Class I municipal deep injection wells (drilled by others); piping to connect the Plant Effluent Loop to the nine new deep injection wells; construction of wellhead pads and installation of wellhead piping and equipment for four (4) monitoring wells; construction of thirteen (13) well houses to house the well instruments and RTU of each well; preparation and final grading and drainage of six (6) sludge drying beds; and associated yard piping at the Central District Wastewater Treatment Plant (CDWWTP). The CDWWTP is owned by the Miami Dade Water and Sewer Department (WASD) and it is located at 3989 Rickenbaker Causeway, Key Biscayne, FL 33149. The design and drilling of the nine Class I municipal deep injection wells is part of a separate contract and is not included in this scope of work. The design and drilling of the four monitoring wells is part of a separate contract and is not included in this scope of work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Water / Sewer
$204,154,462.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2026
August 8, 2026
3989 Rickenbacker Cswy, Key Biscayne, FL
Related To This Project
Key Biscayne, FL
Bid Date: May 12 2026
Key Biscayne, FL
Bid Date: Jun 09 2026
Key Biscayne, FL
Bid Date: Jun 23 2026
Key Biscayne, FL
Bid Date: Jul 07 2026
Key Biscayne, FL
Bid Date: Mar 31 2026
Key Biscayne, FL
Bid Date: Mar 10 2026
Key Biscayne, FL
Bid Date: Feb 03 2026
Key Biscayne, FL
Bid Date: Jan 08 2026
Key Biscayne, FL
Bid Date: Dec 16 2025
Key Biscayne, FL
--
Key Biscayne, FL
--
Key Biscayne, FL
--
Key Biscayne, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
