Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 18, 2026 at 8:00 PM
Updated May 18, 2026
Renovation of a transportation facility in Mobile, Alabama. Completed plans call for the renovation of a transportation facility.
The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for the renovation of a 1,500 SF office at the Alabama Port Authority's Terminal Railway Operations Building in Mobile, Alabama. All areas of the APA Terminal Railway Operations Building are un-restricted access facilities. The work included, but is not limited to, the following: Foundation formwork. Ground slab formwork. Removal of formwork. Concrete ground slabs. The placing, curing, and finishing of all cast-in-place concrete, as indicated on the drawings and specified herein. The setting of all reinforcing, inserts, anchor bolts, sleeves, blocks, and miscellaneous embedded items as indicated on the drawings, and specified herein. For additional project contractual information, please contact the APA Project Manager, Matthew Thomas, PE at Matthew.Thomas@alports.com or 251-441-7242. For technical information, please contact the CMG Engineers, Inc. Project Manager, John Glover, at jglover@cmg-a.com. Please copy Matthew.Thomas@alports.com on all emails. A Guarantee will be required with each bid as follows: (5%) percent of the amount bid, but in no event more than Ten Thousand ($10,000) Dollars, shall be furnished in the form of a certified check or bid bond payable to the Alabama Port Authority. Performance and Payment bonds will be required at the signing of the contract in an amount not less than One Hundred (100%) percent of the contract price. The Contractor will be required to complete the work under the Contract within 300 calendar days after receipt of a "Notice to Proceed". Work will start and the Contractor will be required to furnish proof of purchase of materials within 10 calendar days after receipt of notice to proceed. Insofar as practical, the order of work will be as scheduled by the Contractor and approved by the APA Project Manager. The Contractor is required to submit a schedule detailing the sequence of work and time frame for Contractor's activities within 10 calendar days of receipt of the Notice to Proceed. Contractor's attention is directed to the fact that the facility's cargo handling operation is a priority item, therefore, close coordination with Terminal Railway Operations and the project manager is required. All work shall be according to these specifications and all reference documents. The right is reserved, as the interest of the Alabama Port Authority may require, to reject any and all bids and to waive informalities in bids received. * Faxed or electronically submitted bids will not be accepted. ATTENDANCE TO THE BID OPENING IS NOT MANDATORY. Question Deadline 05/14/2026 at 4:00 PM CT All questions about the meaning or intent of the Contract Documents shall be submitted to the Engineer. Replies will be issued by Addenda emailed to all parties recorded as having received the bidding documents. All addenda so issued shall become part of the Contract Documents. Only questions answered by formal written Addenda will be binding.
GC Bidding
Transportation Terminals
$500,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2026
June 22, 2026
126 Industrial Canal Rd, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: May 15 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 06 2026
Mobile, AL
Bid Date: May 05 2026
Mobile, AL
Bid Date: May 05 2026
Mobile, AL
Bid Date: May 29 2026
Mobile, AL
Bid Date: May 12 2026
Mobile, AL
Bid Date: May 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
